Section 3 • Scheduled Maintenance Procedures
Part No. 96316
GS-30 • GS-32 • GS-46
3 - 13
June 2009
REV F
CHECKLIST
B
PROCEDURES
B-5
Test the Key Switch
Genie requires that this procedure be performed
every 250 hours or quarterly, whichever comes
first.
Proper key switch action and response is essential
to safe machine operation. The machine can be
operated from the ground or platform controls and
the activation of one or the other is accomplished
with the key switch. Failure of the key switch to
activate the appropriate control panel could cause
a hazardous operating situation.
Note: Perform this procedure from the ground
using the platform controls. Do not stand in the
platform.
1 Pull out the red Emergency Stop button to the
on position at both the ground and platform
controls.
2 Turn the key switch to
platform control
.
3 Check the platform up/down function from the
ground controls
.
Result: The machine functions should
not
operate.
4 Turn the key switch to
ground control
.
5 Check the machine functions from the
platform
controls
.
Result: The machine functions should
not
operate.
6 Turn the key switch to the off position.
Result: No function should operate.
B-6
Test the Automotive-style Horn
(if equipped)
Genie requires that this procedure be performed
every 250 hours or quarterly, whichever comes
first.
The horn is activated at the platform controls and
sounds at the ground as a warning to ground
personnel. An improperly functioning horn will
prevent the operator from alerting ground
personnel of hazards or unsafe conditions.
1 Turn the key switch to platform control and
pull out the red Emergency Stop button to the
on position at both the ground and
platform controls.
2 Push down the horn button at the platform
controls.
Result: The horn should sound.
Содержание Genie GS-1530
Страница 4: ...September 2005 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank iv ...
Страница 20: ...June 2009 Section 2 Specifications 2 8 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 140: ...October 2008 Section 4 Repair Procedures 4 86 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 144: ...September 2005 Section 5 Fault Codes 5 4 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 155: ...Section 6 Schematics October 2008 Part No 96316 GS 30 GS 32 GS 46 6 11 This page intentionally left blank ...
Страница 159: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 15 This page intentionally left blank ...
Страница 163: ...Section 6 Schematics June 2009 Part No 96316 GS 30 GS 32 GS 46 6 19 This page intentionally left blank ...
Страница 167: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 23 This page intentionally left blank ...
Страница 171: ...Section 6 Schematics October 2008 Part No 96316 GS 30 GS 32 GS 46 6 27 This page intentionally left blank ...
Страница 175: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 31 This page intentionally left blank ...
Страница 179: ...Section 6 Schematics June 2009 Part No 96316 GS 30 GS 32 GS 46 6 35 This page intentionally left blank ...
Страница 196: ...Section 6 Schematics September 2005 6 52 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...