49/65
14. Put the POWER CABLES 2 WIRES in the MOTOR UNIT COVER
15. Close the group with 8 SCREWS EJOT DELTA PT 50X14
16. Take away the steel tool such as a wrench then put the MAGNET TOP UNIT 40X20X10MM there
17. Close the MOTOR UNIT COVER with attention not to press the cables or the hoses in between
18. Screw the MOTOR UNIT TOP on the MOTOR UNIT COVER with 4 SCREWS CROSS HEAD M4X12
49-1
49-2
49-3
49-4
49-5
49-6
49-7
Содержание i-team i-mop xxl
Страница 1: ...1 64 i mop xxl Service Manual Jan 2018 Warning read the instructions before using the machine...
Страница 10: ...10 64 7 Recovery tank 8 Left battery 9 Right battery 10 Transport wheels 11 Brush motors 9 7 8 10 11...
Страница 11: ...11 64 Internal view 1 Vacuum motor filter 2 Transparent plastic deflector 3 Vacuum hose 2 3 1...
Страница 53: ...53 65 2 14 Fasten 3pcs EJOT SCREW 50X14 to fix the COVER BRUSH MOTOR SCREW each side 53 1...
Страница 57: ...CHAPTER 16 ELECTRICAL SCHEME 57 65 57 1...
Страница 61: ...D if the reading is above 16V the battery is OK 61 65 61 1 61 2...
Страница 63: ...CHAPTER 19 REPAIR FLOW CHART 63 64 64 1 64 2...
Страница 64: ...64 64 65 1 Tennant Company PO Box 1452 Minneapolis MN 55440 Phone 1 800 553 8033 www tennantco com...