36/65
9. Close the INLET TUBE ASSY with the FRONT HOUSING CONTROL UNIT
25. Cover the cable with a piece of heat shrink tubing Ø8 – Ø4 long enough to wrap a portion of the grey
sheath that covers the cable.
26. Connect the PCB CONTROL UNIT with the connector that was created.
27. Complete the other connections of the PCB CONTROL UNIT
36-1
36-2
36-3
36-4
36-5
36-6
36-7
Содержание i-team i-mop xxl
Страница 1: ...1 64 i mop xxl Service Manual Jan 2018 Warning read the instructions before using the machine...
Страница 10: ...10 64 7 Recovery tank 8 Left battery 9 Right battery 10 Transport wheels 11 Brush motors 9 7 8 10 11...
Страница 11: ...11 64 Internal view 1 Vacuum motor filter 2 Transparent plastic deflector 3 Vacuum hose 2 3 1...
Страница 53: ...53 65 2 14 Fasten 3pcs EJOT SCREW 50X14 to fix the COVER BRUSH MOTOR SCREW each side 53 1...
Страница 57: ...CHAPTER 16 ELECTRICAL SCHEME 57 65 57 1...
Страница 61: ...D if the reading is above 16V the battery is OK 61 65 61 1 61 2...
Страница 63: ...CHAPTER 19 REPAIR FLOW CHART 63 64 64 1 64 2...
Страница 64: ...64 64 65 1 Tennant Company PO Box 1452 Minneapolis MN 55440 Phone 1 800 553 8033 www tennantco com...