MAINTENANCE
3-3
235E MM165 (8--95)
RECOMMENDED FIRST 50-HOUR MACHINE INSPECTION
After the first 50 hours of operation, the following
procedures are recommended:
1. Check the floor skirts to floor clearance. See
SKIRTS AND SEALS
.
2. Check the side brush and main brush
patterns. See
BRUSHES
.
3. Change the gearbox gear lubricant and the
drain and fill/level plug seals.
4. Tighten the wheel nuts.
5. Replace the hydraulic fluid filter element.
6. Torque the rear wheel nuts in a star pattern
to 122 to 150 Nm (90 to 110 ft lb).
See
REAR WHEEL.
7. Perform all 50-hour interval lubrication and
maintenance procedures listed in the
MAINTENANCE CHART
.
Содержание 235E
Страница 1: ...235E MM165 Operator Manual ...
Страница 6: ...ABOUT THIS MANUAL 235E MM165 3 91 d ...
Страница 14: ...SPECIFICATIONS 235E MM165 3 91 1 2 ...
Страница 18: ...OPERATION 235E MM165 3 91 2 2 ...
Страница 34: ...MAINTENANCE 235E MM165 3 91 3 2 ...
Страница 42: ...MAINTENANCE 235E MM165 3 94 3 10 03380 HYDRAULIC SCHEMATIC ...
Страница 51: ...MAINTENANCE 3 19 235E MM165 3 93 03382 ELECTRICAL SCHEMATIC For machine below serial number 002205 ...
Страница 52: ...MAINTENANCE 235E MM165 3 93 3 20 03382 ELECTRICAL SCHEMATIC For machines from serial number 002205 to 002310 ...
Страница 53: ...MAINTENANCE 3 21 235E MM165 3 94 03382 ELECTRICAL SCHEMATIC For machines serial number 002311 and above ...
Страница 70: ...MAINTENANCE 235E MM165 3 94 3 38 ...
Страница 72: ...APPENDIX 235E MM165 3 91 4 2 ...