
OPERATION
2-15
235E MM165 (3--91)
6. Lower the machine onto the jack stands.
7. Check to make sure the machine is secure.
8. Service the machine as required.
9. When finished servicing the machine, raise
the machine off the jack stands.
10. Remove the jack stands from under the
machine.
11. Lower the machine.
12. Remove the blocks from the tires.
MACHINE TIE-DOWNS
The machine may be tied down at each corner of
the main frame using the tie-down brackets
supplied in the tie-down kit.
A
03372
FRONT TIE-DOWN LOCATION
A. Tie-Down Bracket
When transporting the machine on a trailer or in a
truck, be sure to set the machine parking brake
and block the machine tires to prevent the
machine from rolling.
Содержание 235E
Страница 1: ...235E MM165 Operator Manual ...
Страница 6: ...ABOUT THIS MANUAL 235E MM165 3 91 d ...
Страница 14: ...SPECIFICATIONS 235E MM165 3 91 1 2 ...
Страница 18: ...OPERATION 235E MM165 3 91 2 2 ...
Страница 34: ...MAINTENANCE 235E MM165 3 91 3 2 ...
Страница 42: ...MAINTENANCE 235E MM165 3 94 3 10 03380 HYDRAULIC SCHEMATIC ...
Страница 51: ...MAINTENANCE 3 19 235E MM165 3 93 03382 ELECTRICAL SCHEMATIC For machine below serial number 002205 ...
Страница 52: ...MAINTENANCE 235E MM165 3 93 3 20 03382 ELECTRICAL SCHEMATIC For machines from serial number 002205 to 002310 ...
Страница 53: ...MAINTENANCE 3 21 235E MM165 3 94 03382 ELECTRICAL SCHEMATIC For machines serial number 002311 and above ...
Страница 70: ...MAINTENANCE 235E MM165 3 94 3 38 ...
Страница 72: ...APPENDIX 235E MM165 3 91 4 2 ...