INSTALLATION METHOD 

 

Identification 

 

The fan coil unit has a label pasted on the panel that shields the motor / blower. 

The label shows either the floor and riser number or the room number. 

The unit must be placed in the correct location in the building in accordance with the label. 

 

Handling 

 

1. 

If the unit has risers attached, do not lift the unit using the riser pipes. 

2. 

Protect  the fan coil from rain  and snow. Be  aware that there have been instances of units  being 

stood  upright,  unsecured  on  the  edge  of  a  building  and  being  blown  off  the  building  during  a 
windstorm. 

Installation of Units with Risers Attached 

 

1. 

A rectangular opening is made in the floor slab, usually sleeved before pouring the floor. Refer to 

the catalog or submittals for sizes. 

 

2. 

Rotate the  unit from the horizontal position to vertical  so that the bottom end of the risers  insert 

into  the  expanded  end  of  the  risers  on  the  unit  below.  2”  is  allowed  in  the  riser  length  for  the 
depth of the insertion. Shim the unit plumb. 

3. 

Before  making  the  solder  joint,  ensure  that  the  run  outs  from  the  supply  and  return  risers  are 
centered in the slots in the cabinet. If this is not done there is considerable risk of distorting the run 
out  when  the  hot  water  riser  expands  causing  the  run  out  to  contact  the  edge  of  the  slot  in  the  
sheet metal potentially causing failures or leaks.  Also ensure that the condensate  riser  stub out  is 
at 90° to the cabinet so that the drain hose is not  kinked. 

 

4. 

Riser anchoring is required for two purposes. The risers are anchored to the floor slab at one or 
more points in the height of the building so that they do not slip down under gravity. The second 
reason  is  to  spread  the  expansion  in  opposite  directions  from  the  anchor  point.  Typically  risers  
will  be  anchored  at  the  midpoint  of  the  height  of  the  building.  If  there  are  riser  expansion  loops 
included in the risers inside the unit, the anchor point will be at the midpoint between two sets of 
loops.  For  example  in  a  16  storey  building  there  will  be  a  loop  on  the  hot  water  riser  on  floor  8  
and  anchors  at  floors  4  and  12.  After  anchoring,  the  risers  are  in  effect  attached  to  the  building 
structure  so  it  does  not  matter  if  the  plastic  straps  holding  the  risers  to  the  unit  break  off  after 
installation. 

Temspec does not advise on the location or method of anchoring as this is the 

responsibility of the engineering company retained to design the riser system. 

5. 

Connect the risers by soldering (not brazing) using 95/5 solder. An additional cap of 50/50 solder 
can be added for extra strength. 

6. 

If the unit has a riser loop inside, remove the support strap. 

 

7. 

Make good the riser insulation between floors. 

 

8. 

Fire stop the floor opening in accordance with code. 

Содержание TVA

Страница 1: ...720 Columbus Road Mississauga Ontario Canada L5T 2G1 Tel 905 6703595 Fax 905 6703592 www temspec com Vertical Stack Fan Coil Units Models TVA TVE TVS INSTALLATION OPERATION AND MAINTENANCE MANUAL 141111 ...

Страница 2: ... agent and Temspec notified within 24 hours Remove the inlet service panel and check the fan wheel for free rotation by spinning it manually Slight misalignment can be corrected by repositioning the motor or by loosening the fan hub set screw and repositioning the fan on the motorshaft Check riser projections at each end of the cabinet for damage that would prevent making an acceptable piping conn...

Страница 3: ...ot necessary to use a pad under the unit Fire stopping the floor opening and making good the riser insulation at the floor opening is the responsibility of the contractor Check that the drain hose is not kinked before soldering the condensate riser If the risers incorporate expansion compensation loops remove the support brackets after anchoring the risers The fan coil unit has unions at the shut ...

Страница 4: ...ng the run out to contact the edge of the slot in the sheet metal potentially causing failures or leaks Also ensure that the condensate riser stub out is at 90 to the cabinet so that the drain hose is not kinked 4 Riser anchoring is required for two purposes The risers are anchored to the floor slab at one or more points in the height of the building so that they do not slip down under gravity The...

Страница 5: ...he page in the submittals which shows where the screws can be located to avoid damaging internal components When using the panel which has quarter turn fasteners the drywall must be attached to the front The sides and back can be framed 2 Framing Frame the unit using metal studs The flange around the return air access opening is 2 deep The type of return air panel which has a hinged filter door in...

Страница 6: ...lar of the fan coil unit rotate the panel upright so that it is against the wall and turn the head of the fastener clockwise to the locked position Type with a hinged filter door in the upper half of the grille panel 1 If the drywall has not been installed flush with the outer edge of the collar on the unit and if a gap exceeding exists between the inner surface of the drywall and the outer edge o...

Страница 7: ...dge of the door and sharply pull the door forwards Lift the door to the horizontal position The filter is now accessible and is removed by sliding it upwards out of the channels behind the grille Annually before the start of the cooling season Remove the return air access panel from the wall Remove the two sheet metal screws which secure the panel that shields the fan assembly Pull the shield pane...

Отзывы: