MODELS: TVA, TVE & TVS IOM Manual 

 

 

 

 

Installation 

 

Unless otherwise requested by the customer at the time of shop drawing approval, the cabinet insulation is 
left intact, covering the supply air openings and, if applicable, the secondary return air opening. The reasons 
for this are: 

 

 

To  provide  a  measure  of  protection  from  wind,  driven  rain  or  snow  entering  the  unit  before  the 
windows are installed. 

 

To prevent construction dust entering the unit. 

The  installer  is  responsible  for  cutting  out  the  insulation  and  buttering  the  cut  edge  prior  to  installing  the 
grilles. 

Remove  the  inlet  service  panel  and  check  the  fan  wheel  for  free  rotation  by  spinning  it  manually.  Slight 
misalignment  can  be  corrected  by  repositioning  the  motor  or  by  loosening  the  fan  hub  set  screw  and 
repositioning the fan on the motor shaft. 

Use solder to connect the risers.  Do not use  Silfos (brazing) as this  will cause the pipe to  overheat and  
the  insulation  to  be  damaged. 

Ensure  that  the  horizontal  run-out  from  each  riser  is  centered    in    the 

slot  in  the  cabinet  and  that  the  run-out  from  the  riser  is  at  90º  as  it  enters  the  cabinet,  prior  to 
soldering  the  risers.  Anchoring  the  risers  to  the  floor  slabs  is  the  responsibility  of  the  contractor. 

Shim  the  unit  plumb.  It  is  not  necessary  to  use  a  pad  under  the  unit.  Fire  stopping  the  floor  opening  and 
making good the riser insulation at the floor opening is  the  responsibility  of  the  contractor.  Check  that 
the  drain  hose  is  not  kinked  before  soldering  the  condensate  riser.  If  the  risers  incorporate  expansion 
compensation loops, remove the support brackets after anchoring the risers. 

The  fan  coil  unit  has  unions  at  the  shut  off  valves.  These  fittings  must  be  checked    prior    to    pressure  
testing  the  system  by  the  contractor    as    part    of    the    installation    procedure.  Mechanical    fittings    can 
loosen  during  transportation  and  handling.  If  contractor  /installer  deem  it  necessary  to  tighten  mechanical 
fittings Temspec does not assume any responsibility for this procedure. 

It is stressed that the component 

manufacturer's recommended procedures be strictly followed

The coil is pressure tested hydrostatically at the factory using a propylene glycol solution. Trace amounts of 
this  solution  are  allowed  to  remain  in  the  coil  to  ensure  that    the    coil    does    not    freeze    during  
transportation.  After testing on site with water the fan coil unit must not be exposed to freezing temperatures. 

The  interior  of  the  unit  must  be  vacuumed  clean  before  the  unit  is  started  up.  This  includes  fan  motor 
windings. 

 

 

Accessories 

Do  not  install  grilles  or  thermostats  until  after  the  walls  have been  painted.  Caution the painter 
against spraying over the labels on the front cover of the unit. 

Содержание TVA

Страница 1: ...720 Columbus Road Mississauga Ontario Canada L5T 2G1 Tel 905 6703595 Fax 905 6703592 www temspec com Vertical Stack Fan Coil Units Models TVA TVE TVS INSTALLATION OPERATION AND MAINTENANCE MANUAL 141111 ...

Страница 2: ... agent and Temspec notified within 24 hours Remove the inlet service panel and check the fan wheel for free rotation by spinning it manually Slight misalignment can be corrected by repositioning the motor or by loosening the fan hub set screw and repositioning the fan on the motorshaft Check riser projections at each end of the cabinet for damage that would prevent making an acceptable piping conn...

Страница 3: ...ot necessary to use a pad under the unit Fire stopping the floor opening and making good the riser insulation at the floor opening is the responsibility of the contractor Check that the drain hose is not kinked before soldering the condensate riser If the risers incorporate expansion compensation loops remove the support brackets after anchoring the risers The fan coil unit has unions at the shut ...

Страница 4: ...ng the run out to contact the edge of the slot in the sheet metal potentially causing failures or leaks Also ensure that the condensate riser stub out is at 90 to the cabinet so that the drain hose is not kinked 4 Riser anchoring is required for two purposes The risers are anchored to the floor slab at one or more points in the height of the building so that they do not slip down under gravity The...

Страница 5: ...he page in the submittals which shows where the screws can be located to avoid damaging internal components When using the panel which has quarter turn fasteners the drywall must be attached to the front The sides and back can be framed 2 Framing Frame the unit using metal studs The flange around the return air access opening is 2 deep The type of return air panel which has a hinged filter door in...

Страница 6: ...lar of the fan coil unit rotate the panel upright so that it is against the wall and turn the head of the fastener clockwise to the locked position Type with a hinged filter door in the upper half of the grille panel 1 If the drywall has not been installed flush with the outer edge of the collar on the unit and if a gap exceeding exists between the inner surface of the drywall and the outer edge o...

Страница 7: ...dge of the door and sharply pull the door forwards Lift the door to the horizontal position The filter is now accessible and is removed by sliding it upwards out of the channels behind the grille Annually before the start of the cooling season Remove the return air access panel from the wall Remove the two sheet metal screws which secure the panel that shields the fan assembly Pull the shield pane...

Отзывы: