![Telular TG-1 Express Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/telular/tg-1-express/tg-1-express_installation-manual_1084965021.webp)
56044702 12
© 2012 Telular Corporation
Step 1: Register the Telguard Unit for Service
Installation Tip:
Register for service prior to leaving for the job site to
avoid a second trip.
The registration form must be completed before leaving for the job site
to install the Telguard product. The registration form may be
completed by:
Online Web Portal –
www.telguardonline.com
Online Form – www.telguard.com
Service registration requests are completed immediately 24/7
using TelguardOnline. Online form submissions take 30 minutes
after receipt of the registration form during Telguard business
hours.
Step 2: Locate Unit and Measure Signal Strength (RSSI)
Locate Unit
Pick a spot next to the alarm panel where you think the Telguard will
be mounted and place the unit down temporarily in that spot. Do not
mount it permanently now, since it may need to be moved to receive a
better cellular radio signal or a remote high-gain antenna may be
necessary.
Note that for a UL compliant installation, the Telguard TG-1 Express
must be mounted in the same room as, and not more than 20ft from
the alarm panel.
Connect DC Power
Before connecting the power cables to the alarm panel, make sure that
the panel’s power source and battery are disconnected.
To connect power to the TG-1 Express using terminal block: