
I-1
Index
A
B
battery
backup 1-5
charge time 1-5
maintenance 2-6
C
Canadian Department of Communications requirements
i-iv
case dimensions 1-4
coin cell battery 5-1, 5-2
coin cell battery replacement procedure 5-2
command line interface commands 3-5
command mode 3-2
configurations 1-1
connecting to the remote agent 3-3
connections
external sensors 1-2
host systems 1-2
phone line 1-2
power 1-2
RS-232-C 2-2
telephone line 2-3
terminal 1-2
connector arrangements 1-3
contact sensors 2-3
country code 4-2, 4-4
Country Code field 4-2
country codes 4-2
D
database 3-1
DC power connection 5-3
default database parameters 3-1
dial-up connection using Remote Agent Manager. 3-3
E
environmental requirements 1-4
European Community requirements i-vii
external power supplies 5-4
F
failover 2-7
FCC i-iii
flash memory 3-1
front panel indicators 4-1
functional verification 2-7
G
H
hardware features, connector arrangement 1-3
host ports 1-2
I
indicators
interactive command mode 3-2
interconnections 2-2
internal battery verification 2-7
internal temperature sensor 2-5
L
LED indicators 4-1
license key 3-1
lithium coin cell battery 5-2
Loader 2-7
loader 3-1
M
modem connection 3-3
modem enum 4-4
modem initialization string 4-2
MTBF 1-5
Multi-Tech modems 4-2, 4-4
N
NET-PATH DC power connection 5-3
network connection
to remote agent 3-3
using Remote Agent Manager 3-4
O
operating system 3-1
operation, see general operation 3-1
OS 2-7
P
Panasonic BR2325 5-2
physical sensor inputs 1-4, 2-3
power requirements 1-4
power reset button 2-6
power-up and verification 2-6
Содержание SEB NET-PATHm
Страница 1: ...SEB NET PATHm Installation and Operation Guide...
Страница 2: ......
Страница 3: ...SEB NET PATHm Installation and Operation Guide...
Страница 6: ......
Страница 18: ...Preface xii Notes...
Страница 24: ...Description and Specifications Page 1 6 Notes...
Страница 56: ...Indicators and Diagnostics Page 4 8 Notes...
Страница 63: ......