NET-PATHm Installation and Operation Guide
Page 2-7
4
The NET-PATHm beeps when the boot process completes. A single beep
indicates that the unit has rebooted and the database loaded without errors. Two
beeps indicate that the unit rebooted, but the database did not load properly.
Three beeps indicate the unit rebooted and is in a default state.
5
If the Status indicator does not illuminate, the NET-PATHm does not have a valid
database loaded. Contact your network system administrator at the Polling and
Analysis Center.
Failover
During the boot process, the Loader starts the APP. Should it encounter problems
with the APP – for example, the APP is corrupt – the Loader will make two additional
attempts to start the APP before it performs a failover and loads the OS. Once the
Loader loads the OS, you can download a new APP and DB to the NET-PATHm.
Return the
Database to a
Default State
You can return a Database to its default state.
1
On the back of the NET-PATHm, press the Reset button once to initiate the
reboot process.
2
The Status light begins flashing and remains flashing for approximately forty
seconds.
3
After about fifty seconds (this may vary with your unit) the Alarm LCD flashes
red once. When this occurs, press the Reset button again.
4
The database will return to its default state.
Internal Battery
Test
To perform an internal battery test
1
Confirm that the internal battery is operating properly.
2
While the unit power is on, unplug the NET-PATHm’s power cord.
3
Verify the Status and Battery indicators are on and the Power indicator is off.
4
Restore commercial power to the NET-PATHm and verify the Power, Status, and
Battery indicators are on.
5
The Battery LED flashes to indicate the battery is charging.
Functional
Verification
Verify that the NET-PATHm can receive calls by initiating calls from the Polling and
Analysis Center. If you can call the NET-PATHm, it is ready for operation. Should
problems occur during the NET-PATHm installation, refer to “Troubleshooting” on
page 4-6 for troubleshooting procedures.
If the NET-PATHm contains an international modem, you must enter the country code
before the modem can function.
Note
This procedure is considered an uncontrolled
shutdown. If you attempt this procedure more than three
times, the NET-PATHm will perform a failover and load the
OS.
Note
If no battery is present in the remote agent, removing
power causes it to shut normally within a few seconds.
Содержание SEB NET-PATHm
Страница 1: ...SEB NET PATHm Installation and Operation Guide...
Страница 2: ......
Страница 3: ...SEB NET PATHm Installation and Operation Guide...
Страница 6: ......
Страница 18: ...Preface xii Notes...
Страница 24: ...Description and Specifications Page 1 6 Notes...
Страница 56: ...Indicators and Diagnostics Page 4 8 Notes...
Страница 63: ......