Tellus Power UP80J Скачать руководство пользователя страница 6

If station housing uints have not already been installed and pre wired, complete this phase now.  Follow the station 
housing installation manual (UP-HIM) that comes with the housing units.   Then ensure the following steps have been 
completed before installing Station Head Units.  

Run power conduit from panel to each station housing in accordance with local electrical codes and regulations.  For 
futur

e upgradability, ensure that conduit is sized for a total of five (5) wires!  including four (4) current carrying conduc-

tors (connected to 2 double pole 40amp breakers) and one (1) Earth conductor. 

Use this diagram for a general overview of a typical site.  Power conduit is always required.  Data conduit between 
stations is always required between multiple stations.   Data conduit to the building is only needed if the onsite Verizon 
2G  data signal is poor.    Alwasy test the Verizon signal before planning the site.  (see page 11 for more detials) 

If more than one station is to be installed in the same area, affix a data conduit T-box below each station housing, then 
run data conduit between each.  Size data conduit to carry up to 2 Cat5e cables each.

Pull Cat5 data cable in accordance with the number of station at the site.   Leave 6ft  of cable extending from top edge of 
conduit wire protector in each station.  Terminate all Cat5 Ethernet cables using identical wire (color) pattern on each 
end (see page 11 for more detials) 

First refer to page 5 for service based wiring options.  

For UP80J head uints, size 3 electrical conductors according to NEC code using the following continuous load amperage 
limits:    Line  (30 Amps continuous), Line  (30 Amps continuous),  and an earth ground sized to match the largest current 
carrying conductor.  Pull these 3 electrical conductors from panel to each station leaving 40 inches of conductor extend-
ing from inside edge of conduit wire protector on the station side. 

Building

Internet

Router

(DHCP)

Service

Panel

STN-1

STN-2

STN-3

STN-4

Data conduit

Required

Cat 5 cables

Building

data conduit 

only required 

if Verizon data

signal poor

Power conduit large enough for 5 wires each. 

Electrical Conduit

Planning:

Pull Electrical Conductors

Data Conduit

Pull Data Cables

Page 6

Station Housing Installation (Wiring):

6B

6A

6C

6D

6E

KIT301-IM-20140501

Содержание UP80J

Страница 1: ...wer com www telluspower com UP80J Networked EV Charging Head Unit Installation Manual 20140501 The UP80J is an electric vehicle charging head designed for installation into GRIDbot standard UP housing...

Страница 2: ...FY This GRIDbot station should not be modified in any way This will void the warranty compromise protection and could result in a possible shock or fire hazard OPERATING CAUTIONS Ensure that the charg...

Страница 3: ...pe buttons LED status indicators RGB led with auto brightness adjust for ambient light Safety devices Ground fault detection 20mA Charge Circuit Interrupt Device CCID20 including 3 auto retry 15 minut...

Страница 4: ...e needed Short driver handle for standard bits Right angle driver ratchet for standard bits Set of SAE wrenches Hole cutting drill bits to match conduit size Spirit Level Smart phone GPS coordinate co...

Страница 5: ...Breaker Panel UP80J Station 40A G L1 L2 240V Level 2 L1 L2 UP80J Station G 240V Level 2 L1 L2 UP80J Station G 240V Level 2 N N Size conduit to carry five 5 wires 4 30 Amp continuous load rated conduct...

Страница 6: ...h station housing then run data conduit between each Size data conduit to carry up to 2 Cat5e cables each Pull Cat5 data cable in accordance with the number of station at the site Leave 6ft of cable e...

Страница 7: ...ed to the base plate by inserting it through the lock washer and into the back of the plate Thread the hardware set into base plate until it is finger tight Now tighten the locking nut down onto the b...

Страница 8: ...ent Store the box in a dry place If repacking is required First place the station head the anti static bag Secure neck of bag with tie Roll cable up in to an 15 diameter coil Leave a 6 between cable c...

Страница 9: ...ing and unravel the charg ing cable s Thread the level 2 coupler s downwards though the black rubber strain relief loop near the base of the station housing post Pull most of the cable s through Loose...

Страница 10: ...First connect the green equipment grounding conductor to the grounding bar on the station head unit NOTE The station will not operate without a successful ground path to the service panel Insert one...

Страница 11: ...5 7 8 on the modular jack at each end orange white orange green white blue blue white green brown white brown Test each segment of terminated cable with a simple battery operated Ethernet tester aprox...

Страница 12: ...IDkey again to confirm the number on the screen matches the ID on the station housing Write the Station ID for each station at the site on the from provided on page 13 Then push the blue back button I...

Страница 13: ...Station ID Qty L 1 Ports Qty L 2 Ports GPS 888 88888888 888 88888888 Station ID Qty L 1 Ports Qty L 2 Ports GPS 888 88888888 888 88888888 Station ID Qty L 1 Ports Qty L 2 Ports GPS 888 88888888 888 8...

Отзывы: