Tellus Power UP80J Скачать руководство пользователя страница 11

Master

Client

Networked

Networked

Networked

Networked

Networked

Networked

Networked

Networked

Client

Client

Before ordering Station Heads, It is best to go to the site with a 2G Verizon Mobile phone  and check the verizon data 
signal strength.   This will help you to plan one of the  “Master” station to be placed in a strong signal location.   This  
Master station will data connectivity to the all other stations connected to it with Cat 5 cable.  If good Verizon signal is 
det

ected, order one station head with -MSTR-V  suffix, and proceed with option 1 bellow.  If not see Options 2 and C.

Most cost effective way to network stations is 
via a Verizon Master station.  All stations at the 
site can be supported by one Master station 
daisy chainged with Cat5 cable to the rest of 
the stations (Client).  Configure the site as 
follows: 

Regardless of the option above,  Install data conduit and pull Cat5 cable 
between each station in a linear daisy chain manor leaving 6ft  of Cat5 in 
each station.   Each network segment between stations can have a maxi-
mum distance of 90 metres (300 ft). 

Terminate cables with Rj45 male connectors.  Standard termination for Cat5 
(T568B) wires are in the order 1, 2, 3, 6, 4, 5, 7, 8 on the modular jack at each 
end:   orange/white, orange, green/white, blue, blue/white, green, 
brown/white, brown.

Test each segment of terminated cable with a simple battery operated 
Ethernet tester  (aprox $20 and most computer supply stores).  

If Verizon signals are not strong enough and 
ATT has a good signal, you may replace the 
master module with a kit.  Order  UP-COM-ATT 
-3G.   This kit comes with a bracket and 
instruction for installing inside the firsts 
station.  Once again all other stations at the 
site can be supported by this one Raven 
Router station.  Configure the site as follows: 

If no mobile carrier has a good signal at the site you 
can also support all stations by connecting them to 
the building internet router.   However , make sure 
that the internet connection to this router is reliable.   
Stations will not allow charging without an internet 
connection. 
If this is not possible, you will have to order internet 
service from a local provider and have them install 
the router on the wall next to the service panel. Then 
configure the site as follows: 

Test site mobile signal strength:

Instal data conduit and cable:

Option 1 :   Master Verizon 

Option 2 :   UP-COM-ATT-3G Kit 

Option 3 :   Building Router

Page 11

Station Data Wiring:

11A

11E

11B

11C

11D

KIT301-IM-20140501

Building

Internet

Router

(DHCP)

STN-1

-MSTR

STN-2

STN-3

STN-4

STN-1

STN-2

STN-3

STN-4

Raven

Router

STN-1

STN-2

STN-3

STN-4

Содержание UP80J

Страница 1: ...wer com www telluspower com UP80J Networked EV Charging Head Unit Installation Manual 20140501 The UP80J is an electric vehicle charging head designed for installation into GRIDbot standard UP housing...

Страница 2: ...FY This GRIDbot station should not be modified in any way This will void the warranty compromise protection and could result in a possible shock or fire hazard OPERATING CAUTIONS Ensure that the charg...

Страница 3: ...pe buttons LED status indicators RGB led with auto brightness adjust for ambient light Safety devices Ground fault detection 20mA Charge Circuit Interrupt Device CCID20 including 3 auto retry 15 minut...

Страница 4: ...e needed Short driver handle for standard bits Right angle driver ratchet for standard bits Set of SAE wrenches Hole cutting drill bits to match conduit size Spirit Level Smart phone GPS coordinate co...

Страница 5: ...Breaker Panel UP80J Station 40A G L1 L2 240V Level 2 L1 L2 UP80J Station G 240V Level 2 L1 L2 UP80J Station G 240V Level 2 N N Size conduit to carry five 5 wires 4 30 Amp continuous load rated conduct...

Страница 6: ...h station housing then run data conduit between each Size data conduit to carry up to 2 Cat5e cables each Pull Cat5 data cable in accordance with the number of station at the site Leave 6ft of cable e...

Страница 7: ...ed to the base plate by inserting it through the lock washer and into the back of the plate Thread the hardware set into base plate until it is finger tight Now tighten the locking nut down onto the b...

Страница 8: ...ent Store the box in a dry place If repacking is required First place the station head the anti static bag Secure neck of bag with tie Roll cable up in to an 15 diameter coil Leave a 6 between cable c...

Страница 9: ...ing and unravel the charg ing cable s Thread the level 2 coupler s downwards though the black rubber strain relief loop near the base of the station housing post Pull most of the cable s through Loose...

Страница 10: ...First connect the green equipment grounding conductor to the grounding bar on the station head unit NOTE The station will not operate without a successful ground path to the service panel Insert one...

Страница 11: ...5 7 8 on the modular jack at each end orange white orange green white blue blue white green brown white brown Test each segment of terminated cable with a simple battery operated Ethernet tester aprox...

Страница 12: ...IDkey again to confirm the number on the screen matches the ID on the station housing Write the Station ID for each station at the site on the from provided on page 13 Then push the blue back button I...

Страница 13: ...Station ID Qty L 1 Ports Qty L 2 Ports GPS 888 88888888 888 88888888 Station ID Qty L 1 Ports Qty L 2 Ports GPS 888 88888888 888 88888888 Station ID Qty L 1 Ports Qty L 2 Ports GPS 888 88888888 888 8...

Отзывы: