Assembly And Maintenance Manual for Telink BLE 1x6 Test System 3.2
AN-18071200-E1
26
Ver 1.0.0
Figure 22 Firmware burning interface 1 for EVK daughter board
First click the “Select Project Folder” button and select the target project folder
(i.e. the project under “platform”) in the pop-out window. The selected project path
will be available in the box next to the “Select Project Folder” button; test script and
product configuration information files will be available in the “test.tls” and
“product.ini” editing window, respectively.
Figure 23 Firmware burning interface 2 for EVK daughter board
test.tls
product.ini
Telink
for
customer