Server Installation and Maintenance
Installing the Server
24
Lightspeed G-Series Guide
Installing the Server in the Rack
When selecting a position in a rack to place the server, be sure to allow a minimum of
30 inches (0.76 meters) of clearance at the back of the server for sufficient cooling
airflow and servicing.
WARNING:
Do not pick up the server with the front handles. They are designed to pull the
system from a rack only.
To install the server, follow this procedure:
1.
Slide the inner rail extensions forward into the front of the outer rails.
2.
Support the chassis and align the back of the chassis with the front of the rails.
3.
Push the chassis backward, sliding it into the rack rails, until the chassis clicks into
the locked position.
CAUTION:
To prevent the server from falling and becoming damaged, be sure it is
securely in the rack before you remove support.
Note:
The figure shown is for illustrative purposes only. Always install servers at the
bottom of the rack first.
Содержание Vantage Lightspeed G Series
Страница 1: ...Lightspeed G Series Server Guide Serial Lightspeed G Series Server Guide October 2021 314020...
Страница 10: ...Safety Information Avoiding Electrostatic Discharge 10 Lightspeed G Series Guide...
Страница 18: ...Technical Specifications Power Requirements 18 Lightspeed G Series Guide...