
Teledyne API Model 465L O3 Monitor Operation Manual
05509G DCN6806
Teledyne API Model 465L O
3
Monitor Manual
21
2.
Turn on the 465L by switching the switch on the left side of the rear panel, or
applying power to the monitor (NEMA configuration.) The front panel display
should light with a sequence of messages, including the instrument serial
number and software revision. (When the instrument first powers up, the display
will show ‘xxxx’, indicating that the instrument is in start-up mode, waiting for
the UV detector readings to stabilize).
3.
After the start-up period, the instrument will begin displaying the ozone
concentration and the optional stream selector will begin operating, if installed.
4.3.
Pneumatic Connections
NOTE
Sample tubing made from an inert material such as Teflon should be
used to minimize sample degradation.
Figure 4-2: Pneumatic Connections, Rack Mount Configuration
Содержание 465L
Страница 2: ......