
2 Installation
Model 2010A
2-8: Part II
Teledyne Analytical Instruments
the system is ready to test.
Before
plugging either of the units into their
respective power sources:
•
Check the integrity and accuracy of the gas connections. Make
sure there are no leaks.
•
Check the integrity and accuracy of the electrical connections.
Make sure there are no exposed conductors
•
Check that sample pressure is between 3 and 40 psig, according
to the requirements of your process.
Power up the system, and test it as follows:
1. Repeat the Self-Diagnostic Test as described in Part I, chapter 4,
section 4.3.5.
Содержание 2010A
Страница 16: ...Teledyne Analytical Instruments 1 Part 1 Introduction Model 2010A ...
Страница 22: ...2 6 Part I 2 Operational Theory Model 2010A Teledyne Analytical Instruments ...
Страница 34: ...Teledyne Analytical Instruments 3 Installation Model 2010A 3 12 Part I ...
Страница 70: ...5 Maintenance Model 2010A 5 6 Part I Teledyne Analytical Instruments ...
Страница 86: ...1 4 Part II Teledyne Analytical Instruments 1 Introduction Model 2010A ...
Страница 104: ...4 Maintenance Model 2010A 4 8 Part II Teledyne Analytical Instruments ...