
Thermal Conductivity Analyzer
Part II: Analysis Unit
Teledyne Analytical Instruments
Part II: 2-1
Installation
Installation of the Model 2010A Analyzer includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
the Analysis Unit
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
2.1
Unpacking the Analysis Unit
The analyzer is shipped with all materials needed to install and prepare the
system for operation. Carefully unpack the Analysis Unit and inspect it for
damage. Immediately report any damage to the shipping agent.
2.2
Mounting the Analysis Unit
The Model 2010A Analysis Unit is for use in Class 1, Division 1,
Groups C and D, hazardous environments (group B available). The actual
class is limited by the flame arrestor option.
The standard model is designed for bulkhead mounting. Overall dimen-
sions of the Analysis Unit will vary depending on options. The maximum
footprint will be 19
″
×
12
″
, and maximum height 9.4
″
. An Outline Drawing
at the back of this manual, gives the correct mounting dimensions for your
unit.
Note: The housing, including the cover, protrudes 8.6 to 9.4
inches
from the base on which it is mounted. Enough clearance is
required in front of the cover to allow the cover to be re-
moved.
Figure 3-1 is a view with the cover removed showing the external Gas
Connector Panel and the internal Electrical Connector Panel.
Содержание 2010A
Страница 16: ...Teledyne Analytical Instruments 1 Part 1 Introduction Model 2010A ...
Страница 22: ...2 6 Part I 2 Operational Theory Model 2010A Teledyne Analytical Instruments ...
Страница 34: ...Teledyne Analytical Instruments 3 Installation Model 2010A 3 12 Part I ...
Страница 70: ...5 Maintenance Model 2010A 5 6 Part I Teledyne Analytical Instruments ...
Страница 86: ...1 4 Part II Teledyne Analytical Instruments 1 Introduction Model 2010A ...
Страница 104: ...4 Maintenance Model 2010A 4 8 Part II Teledyne Analytical Instruments ...