Teledyne Lecroy Summit Z58 Скачать руководство пользователя страница 6

7.

Plug in the output cable of the Power Adapter to the power connector on the Summit Z5 Controller Board (see figure below):

8.

Install the PCIe Protocol Analysis Software following the steps below (See 

section "6"

).

9.

Power ON the 

Summit 

Z58 system.

10.

Use PCIe Protocol Analysis Software to configure it and start the exerciser/analyzer (See 

section "8"

).

11.

You can setup and connect the Summit Z58 to your host machine though either a USB or Ethernet connection. (See 

section "7"

).

12.

After the Summit Z58 is setup and connected, the next step is to connect your DUT to the system and start recording traffic (See 

section "8"

).

13.

Power ON the host DUT.

                     

    

Warning: Do not disconnect the 12" cable while the Summit Z58 system is powered ON.            

  

Note:

If the Summit Z58 will be installed in a PXP500 or Gen5 capable platform, follow the installation steps in the 

Summit Z5 User Manual

.

Push the power plug into 

the controller’s power 

connector until you hear a 

"click" noise.

Controller’s

Power Connector

Power Plug (about to be 

attached to Controller)

Note: 

  To disconnect the power cable from the Controller Board, the outer sleeve of the end of the connector must be pulled back to 

free the locking mechanism. With the sleeve pulled back, the connector can be disconnected from the Controller Board.

Make sure airflow is not blocked to the intake for the Summit Z58. This may happen when
installing a large DUT card on the slot next to the Summit Z58 Main board.

Содержание Summit Z58

Страница 1: ...rotocol Analysis Software installation or at the Teledyne LeCroy website teledynelecroy com sw pciexpress Components The package includes the following components Summit Z58 Main board Summit Z5 Contr...

Страница 2: ...ace Ethernet Interface Sync Data Interface Power On LED Indicator Status LED Indicator Trigger LED Indicator Speed GT s LED Indicator Training LED Indicator Signal Activity LED Indicators Tx 7 0 and R...

Страница 3: ...Cable SW1 Remote Power Enable Switch This switch allows the Z58 to be powered on remotely from a network controlled AC power port SW1 Remote Power Enable Switch SW1 Selection Z5 Controller 0 Summit Z5...

Страница 4: ...ure Z58 main board bracket to host chassis with screw 4 Attach 12 cable to the Z58 main board The connectors are keyed so only one end can be connected 5 Attach the TX SSC CLK cable to the connector o...

Страница 5: ...Summit Z58 Main Board Summit Z5 Controller Board 12 inch Controller Cable connecting Main Board to Controller Board TX SSC CLK Cable...

Страница 6: ...Power ON the host DUT Warning Do not disconnect the 12 cable while the Summit Z58 system is powered ON Note If the Summit Z58 will be installed in a PXP500 or Gen5 capable platform follow the install...

Страница 7: ...gs through the PCIe Protocol Analysis see Summit Z58 User Manual Connecting to Summit Z58 in the software Assuming the host PC and the Summit Z58 are on the same subnet Start the PCI Protocol Suite so...

Страница 8: ...e Configure the Summit Z58 to start proper traffic generation See Summit Z58 User Manual for details 3 If testing a motherboard power on the motherboard If testing a DUT power on the DUT Generating Tr...

Отзывы: