Teledyne Lecroy Summit Z58 Скачать руководство пользователя страница 5

Summit Z58 Main Board

Summit Z5 Controller Board 

12 inch Controller Cable connecting 

Main Board to Controller Board

TX SSC CLK Cable

Содержание Summit Z58

Страница 1: ...rotocol Analysis Software installation or at the Teledyne LeCroy website teledynelecroy com sw pciexpress Components The package includes the following components Summit Z58 Main board Summit Z5 Contr...

Страница 2: ...ace Ethernet Interface Sync Data Interface Power On LED Indicator Status LED Indicator Trigger LED Indicator Speed GT s LED Indicator Training LED Indicator Signal Activity LED Indicators Tx 7 0 and R...

Страница 3: ...Cable SW1 Remote Power Enable Switch This switch allows the Z58 to be powered on remotely from a network controlled AC power port SW1 Remote Power Enable Switch SW1 Selection Z5 Controller 0 Summit Z5...

Страница 4: ...ure Z58 main board bracket to host chassis with screw 4 Attach 12 cable to the Z58 main board The connectors are keyed so only one end can be connected 5 Attach the TX SSC CLK cable to the connector o...

Страница 5: ...Summit Z58 Main Board Summit Z5 Controller Board 12 inch Controller Cable connecting Main Board to Controller Board TX SSC CLK Cable...

Страница 6: ...Power ON the host DUT Warning Do not disconnect the 12 cable while the Summit Z58 system is powered ON Note If the Summit Z58 will be installed in a PXP500 or Gen5 capable platform follow the install...

Страница 7: ...gs through the PCIe Protocol Analysis see Summit Z58 User Manual Connecting to Summit Z58 in the software Assuming the host PC and the Summit Z58 are on the same subnet Start the PCI Protocol Suite so...

Страница 8: ...e Configure the Summit Z58 to start proper traffic generation See Summit Z58 User Manual for details 3 If testing a motherboard power on the motherboard If testing a DUT power on the DUT Generating Tr...

Отзывы: