![Telect LCX Series Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/telect/lcx-series/lcx-series_user-manual_1080057051.webp)
Telect, Inc. • USA +1.509.926.6000 • 52.33.3836.37.52
www.telect.com • © 2010 Telect, Inc., All Rights Reserved, 126254-4 A0.1
Page 4-46
4.2.2 Patching (1RU)
LCX 1RU Patch Panels are cabled in much the same way as the other panels. If network element
jumpers are gathered in IFC cables, use cable clamps as they are used for the LCX 1RU Splice
Panels. To install pigtails, jumpers, or patch cords in an LCX 1RU Patch Panel,
1. Route the pigtails/jumpers/patch cords between pivoting arcs.
2. Pull out or unscrew the adapter plug and insert the cabling connector.
3. After connecting, use hook and loop straps, cable ties, or other restraints to tie down pigtails/
jumpers/cords to the floor of the panel.
4. Fill out the tray label and affix to the front of the tray.
5. If applicable, store the excess pigtails, jumpers, or cords on an appropriate interbay
storage frame.