![Telect DSX-3 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/telect/dsx-3/dsx-3_user-manual_1080066015.webp)
Telect, Inc. • USA +1.509.926.6000 • 52.33.3836.37.52
www.telect.com • © 2010 Telect, Inc., All Rights Reserved, 139256 A0
Page 2-11
2.3 Installation
1. Mount the BCS 4R chassis, along with designation cards, to a rack, using the four supplied
mounting screws (two per side). Torque to 35 in.-lbs (4.29 N•m.).
Figure 7 - Mounting Chassis to Rack
2. Install cable management rings on the rear rack flange using the hardware provided.
3. Repeat Steps 1 and 2 to install all BCS 4R chassis before installing power and I/O cables to
any BCS 4R chassis in the rack.
4. For BCS 4R chassis that require power, route power from the power distribution panel to con-
nectors on the rear of BCS 4R chassis.
Use wire in the 10-22 AWG range. Strip away about
3
/8
in. (~10 mm) of insulation and then
press in on the tab at the top of the connector to open the connector’s jaws. Insert the wire
below the tab and then release the tab to cinch the wire.