800 Series Standalone and 800 Series 1+1 System Installation Guide
8
Not included:
•
A 19" equipment rack. The 800 1 unit must be installed in a standard 19" wide equipment
rack.
1+1 Patch Panel
One or two 1+1 patch panels are required for the proper connection of each grouping of 8 lines of the
800 series 1+1 system.
Cables provided
: You are provided with 16 RJ48C cables (yellow), two meters in length with your 1+1
Patch Panel (8 T1/E1).
Table
2.1
1+1 Patch Panels for 1 and 1
1+1 Patch Panel (8/T1/E1)
Provides connection for up to 8 T1/E1 lines from the network to
the 1+1 Patch Panel (8 T1/E1) and then links to the
TMG800/TSG800 and 1/1
Cables provided:
You are provided with 16 RJ48C cables (yellow), two meters in
length, per 1+1 Patch Panel (8 T1/E1) you receive.
Содержание 800 1+1 series
Страница 1: ...Installation Guide 800 Series Gateway Standalone 800 Series Gateway 1 1 October 26 2015...
Страница 37: ...31 Installing the Equipment 3 Once you confirm the changes a progress page is displayed...
Страница 39: ...33 Installing the Equipment 3 Select a host from the Host Configuration List 4 Select the Status tab...
Страница 46: ...800 Series Standalone and 800 Series 1 1 System Installation Guide 40...
Страница 54: ...800 Series Standalone and 800 Series 1 1 System Installation Guide 48...