Installation
Connecting to the host instrument
1.
Slide the probe body into the FlexChannel
or VPI receptacle. The probe clicks into
place when fully engaged.
When the probe is connected, the host
instrument reads information from the
probe and identi
fi
es the device.
NOTE.
Allow the probe to warm up for at
least 20 minutes to achieve guaranteed
speci
fi
cations.
2.
Attach one of the following probe cables
to the SMA connector on the probe body.
Limit SMA nut torque to 8 in-lbs for either
attachment or removal:
SMA-to-SMA standard cable (standard
accessory)
SMA-to-MMCX standard cable (standard
accessory)
SMA-to-MMCX high-temperature cable
(optional accessory)
1 GHz browser probe cable (optional
accessory)
3.
To disconnect, press the latch release
button and pull away from the instrument.
Probe controls and indicators
Status LED
When the probe is powered on, the multicolor
Status LED:
A solid green LED indicates that the
probe has initialized and is in the normal
operating mode.
A
fl
ashing green LED indicates that
the probe is connected, but has not
initialized.
A red LED in any state indicates an error
condition exists. (See page 35,
2
TPR1000 and TPR4000 User Manual
Содержание TPR1000
Страница 1: ...x TPR1000 and TPR4000 Active Power Rail Probes ZZZ User Manual P077154200 077 1542 00 ...
Страница 2: ......
Страница 3: ...TPR1000 and TPR4000 Active Power Rail Probes ZZZ User Manual xx www tek com 077 1542 00 ...
Страница 6: ......
Страница 50: ...Maintenance 36 TPR1000 and TPR4000 User Manual ...