2260B Series User Manual
88
Note
Ensure load cables have sufficient
current capacity.
Page 44
Re-attach the protection dummy plug when not in
use.
Master-Slave Series Operation
Master-Slave
Configuration
Before using the power supplies in series, the
master and slave units need to be configured.
1.
Configure the OVP and OCP
settings for the master unit.
Page 60
2.
For each unit, hold the Function
key while turning the power on to
enter the power on configuration
settings.
3.
Configure F-93 (Master/Slave)
setting for each master/slave unit.
Page 120
Unit
F-93
Master (local or series operation)
0
Slave unit (series)
4
4.
Cycle the power on the units (reset the power).
Note
Configuration settings can be checked for both the
master and slave units by pressing the Function
key.
Содержание Keithley 2260B Series
Страница 5: ...Series 2260B Multi Range Programmable DC Power Supplies USER MANUAL ISO 9001 CERTIFIED MANUFACTURER ...
Страница 14: ...2260B Series User Manual 10 Considerations 33 Grounding 36 ...
Страница 43: ...OPERATION 39 Remove Test Sequence 99 Test Sequence Error Messages 100 ...
Страница 52: ...2260B Series User Manual 48 Removal Reverse the procedure to remove the terminal covers ...
Страница 111: ...CONFIGURATION 107 Note Power On and Calibration settings can only be set during power up ...