G10 Installation Guide 7.13.2
10
1
G10 New Installation and Upgrade Workflows
Rev. 005-140228
G10 N
EW
I
NSTALLATION
W
ORKFLOW
To protect the G10 from electrostatic discharge (ESD) damage, be sure to wear an
anti-static device while working with the hardware. An anti-static wrist strap is
provided with the G10.
summarizes the installation steps for a G10 probe. Refer to the respective chapter
for more details. See also
for details.
for procedures for removing and replacing G10 hardware components
such as the blades and RTMs.
G10 U
PGRADE
W
ORKFLOW
This upgrade workflow is ONLY for an individual G10 chassis configuration. If
upgrading a G10 probe to be used in a multi-chassis (stacked) probe, refer to one of
the following guides:
G10 Media Probe Installation Guide
G10 Control Plane Probe Installation Guide
summarizes the steps for upgrading G10 probes. Refer to the respective page for
details. See also
for details.
Table 1.1 - G10 Installation Summary
Step
Installation Step
Refer to:
1
Install Hardware and Power Cabling
2
Connect Ethernet and SAS Cabling
3
Power On G10 and Configure Network Connectivity
4
Connect G10 to the Monitored Network
Table 1.2 - G10 Upgrade Workflow
Step
Upgrade Step
Refer to:
1
Upgrade Iris Server and Probe Software
2
Upgrade hardware:
Upgrade Applications Blade (IAP)
3
Connect Ethernet and SAS Cabling
4
Connect G10 to the Monitored Network
5
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited