![Tektronix 2245A Скачать руководство пользователя страница 159](http://html.mh-extra.com/html/tektronix/2245a/2245a_operators-manual_1078849159.webp)
Performance Check Procedure
e.
Set A INTEN to midrange.
f.
Disconnect the test equipment from the 2245A.
2. PRO B E A D J U S T O u tp u t
a.
Set:
CH 1 VOLTS/DIV
10 mV
SEC/DIV
0.2 ms
b.
Connect a 10X probe to the CH 1 input connector and connect the
probe tip to the 2245A PROBE ADJUST output. (When using Tektronix
coded probes, the readout changes to .1 V.)
c.
CHECK—For a 5-division vertical display of PROBE ADJUST square-
wave signal (square-wave period is typically 1 ms, within 25%).
3.
A U TO S ETUP F u n c tio n a l C h e c k
a.
Set:
CH 1 COUPLINQ
GND
CH 1 VOLTS/DIV
2 mV
A SEC/DIV
20 ns
b.
Press the AUTO SETUP button.
c.
Check that the Probe Adjust waveform is stably displayed on the upper
half of the crt.
2245A Operators
7-49
Содержание 2245A
Страница 15: ...2245A Operators Qservice This Docum ent is a complete scan from the Original Tektronix Manual Qservice SECTION ...
Страница 106: ...Performance Characteristics Figure 6 2 Dimensional drawing standard cabinet 6 18 2245A Operators ...
Страница 107: ...Performance Characteristics 6 5 5 8 25 Figure 6 3 Dimensional drawing rackmount cabinet 2240F1R 2245A Operators 6 19 ...