Installation on tanks containing one liquid and foam
•
The bypass chamber must have a process connection that is above the maximum level of
liquid.
•
The bypass chamber must have a process connection that is below the lowest measured level
of liquid.
Installation on tanks containing more than one liquid
•
The bypass chamber must have a process connection that is above the maximum level of
liquid.
•
The bypass chamber must have a process connection that is below the lowest measured level
of liquid.
•
There must be more process connections along the length of the bypass chamber. These
must have a minimum diameter of 25 mm / 1
¨
with a minimum distance of 100 mm / 4
¨
between the holes.
•
If the probe has a counterweight, make sure that there is enough space between the
counterweight and the wall of the stilling well.
•
If the interface liquid does not have a layer of air above it, fit a vent at the top of the bypass
chamber. Refer to the illustration that follows:
Figure 3-21: Installation recommendations for bypass chambers with no air gap
1
Bypass chamber with no air gap
2
Air vent
28