
STEP 10: Install the Bezels as shown above.
STEP 9: Spray adhesive around Pate and fold fabric over.
Section:
Description:
Page No:
Date:
SPRAY ADHESIVE
INSTALL BEZELS
TLE_505b
8 of 11
May 2020
BASE FEED
LIGHTING, ELECTRICS AND COMMUNICATIONS
J
Adhesive
NOTE: Installation of
Communication Bezel (EBFQC)
is the same procedure up to this
step. Data cables may be routed
into the interior of the panel at
this point.
H
I
OR