
STEP 9: Install the Base Feed Mounting Bracket as shown above.
STEP 8 : Lift up the Element vertically. Install the Bezels as shown above.
Section:
Description:
Page No:
Date:
INSTALL BEZEL
INSTALL MOUNTING BRACKET
TLE_505a
7 of 12
May 2020
BASE FEED
LIGHTING, ELECTRICS AND COMMUNICATIONS
H
NOTE: Installation of Communication Bezel (EBFQC) is
the same procedure up to this step. Data cables may be
routed into the interior of the panel at this point.
J
I
OR
B