69
Fig. 6.2
FC-ZF-46 (mounting base included)
❖
Installation Example
When install the zero-phase core, no matter it is installed on the input or output side of the inverter, the three
wires (R, S, T or U, V, W) must run through the same zero-phase core together and be wound in the same
direction then it is effective. And the installation location should be as close as possible to the inverter.
❖
Attenuation characteristics
PRGM
DIGITAL OPERAT OR JN EP- 31
DRIVE FWD REV REM OTE
DRIVE
EDIT
ENTER
RESET
FWD
REV
DSPL
JOG
RUN
STOP
PRGM
DIGITAL OPERAT OR JN EP- 31
DRIVE FWD REV REM OTE
DRIVE
EDIT
ENTER
RESET
FWD
REV
DSPL
JOG
RUN
STOP
Содержание TDS-F8
Страница 13: ...11 1 7 基本配線 圖 1 3 變頻器標準配線圖 表示主回路端子 表示控制端子 ...
Страница 22: ...20 3 3 操作器操作 顯示模式說明 一體式操作器 TDS F8 變頻器內含一體式的數位操作器外 其操作方式分別說明如下 A 一體式操作器操作顯示模式 ...
Страница 38: ...36 衰減特性 ...
Страница 39: ...37 6 5 數位操作器安裝尺寸 TMCA V8 LED ...
Страница 40: ...38 TMCA V803 LED 操作器與外拉固定框尺寸 TMCA V803 LED 外拉固定框 75 4 44 71 4 102 4 21 5 24 98 4 102 4 74 ...
Страница 57: ...55 3 3 Menu Structure for Operators Local Operator LOP Fig 3 3 LOP Screen Structure ...
Страница 72: ...70 6 5 Mounting Dimension of External Remote Operator TMCA V8 LED Dimension ...