background image

Teikoku USA | Chempump

Instruction Manual G-Series

24

 

17.   Reassemble pump by reversing the disassembly procedure, 

replacing old gaskets with new ones. BE SURE TO TAKE UP 
EVENLY ON BOLTS SECURING BEARING HOUSING. Other-
wise, the housing may skew and misalignment will cause 
rapid bearing wear. Bolt torque values by model are provided 
in 

Appx.  C., Page 31

18.   Complete reassembly. Before bolting the motor section to 

the pump casing, spin the rotor impeller assembly by hand to 
ensure that it does not bind. Check end play again as noted 
in 

Table 4-3

 before reassembling the rear bearing housing 

to the stator assembly but after bolting the pump casing to 
motor section.

19.   In reattaching the impeller nut to rotor assembly it is vital that 

the impeller nut be tightened to proper torque to lock the 
nut onto the threads. The Proper torque values are: Models 
GA, GB, GC, GVBS: 12 FT-LBS. Models GVD, GVE, GVHS, GG 
GM: 75 FT-LBS.

4.5.4  Models GLD Recommended Tools for 

Disassembly

Table 4-7. Recommended Tools

Size

Description

1/2" and 9/16"

Open end, box end wrench for circulation 
tube fitting.

3/4"

Open end, box end wrench for pump 
casing, rear bearing housing and base 
cradle retaining bolts (WHIZLOCK).

1/2" Drive, 1 Socket

For impeller nut.

5/32" Hexwrench

Socket flat head cap screws for front 
bearing housing retaining screws.

3/8"

Open end, box end wrench for stator 
assembly retaining screws (WHIZLOCK).

5/8"

Open end, box end wrench for relief valve 
top.

9/16" and 5/8"

Open end, box end wrench for pump 
casing drain plugs.

7/16"

Open end, box end wrench for bearing 
assembly retainer screws

4.5.5  Models GLD Disassembly and Reassembly

Unlike the other G-Series models covered by this manual, the 
Model GLD is a two-stage model and as a result disassembly and 
reassembly instructions are a bit different. The step by step pro-
cedure is as follows: 

1.    Close discharge valve, shutdown pump, and then close the 

suction valve.

2.    Disconnect the power cables from the connection box prior to 

disassembly (WARNING: PERSONNEL SAFETY HAZARD WILL 
EXIST IF THIS STEP IS NOT FOLLOWED).

3.   Drain pump.

4.    Begin disassembly, carefully examining each part for evidence 

of corrosion or wear.

5.    Remove circulating tube, back-flush piping, or reverse circula-

tion piping, if so equipped.

6.    Remove water jacket cooling inlet and drain connections, if 

used.

7.    Remove bolt s holding rear bearing housing and then remove 

the housing.

8.    Remove the screw and lock washer holding the rear bearing 

to the rear bearing housing and then remove the rear bearing. 
If the pump is equipped with a bearing wear detector, please 
refer to 

Table 2-1

 prior to removing the rear bearing.

9.    Check end play as indicated in 

Table 4-3

.

10.  Then, moving to the front of the unit, remove bolts holding 

pump casing cover plate to pump casing, and then remove 
cover.

11.   Remove the exposed impeller nut (left hand thread) and then 

the impeller, and key (second stage impeller).  Second stage 
impeller has tapped pull holes for easy removal and for hold-
ing impeller when removing impeller nut.

12.   Remove the spacer sleeve from the shaft.

13.   Remove bolts holding motor section to pump casing.

14.  a)  If a base is provided, loosen one bolt and remove the 

other which holds together the upper and lower sections 
of the base assembly. Next, pull the motor section, resting 
on the upper half or cradle portion of the base assembly, 
away from the pump casing until the front end of the rotor 
shaft is clear of the casing. Then, rotate the motor section 
and cradle to a point which will allow further disassembly 
of the unit. This specially constructed base, which is fur-
nished as standard on all G-Series models, allows inspec-
tion or maintenance to be performed on the unit without 
its having to be removed to a workbench or without the 
motor having to be set on the floor or ground. If desired, 
the motor section can be removed from the lower base 
section and taken to another area for inspection. In this 
case, the upper half of the base is used as a stand to pro-
tect the parts.

       b)  If a base is not supplied, remove the motor section, and if 

necessary, disconnect the power cable from the connec-
tion box if the unit is to be taken to a workbench.

15.   Slip off the first stage impeller and remove the key from the 

shaft.

16.   Withdraw the rotor assembly from the rear of the motor 

section, taking care not to allow the rotor or shaft to hit the 
stator liner.

17.   Remove the three screws retaining the front bearing housing 

to the stator assembly and then remove the housing.

18.   Remove the screw and lock washer holding the front bearing 

to the front bearing housing and then remove the bearing.

19.   Slip out the idler bearing from the pump casing.

20.   A check for bearing wear can be made at this point. See 

Table 4-2

.

21.   Reassemble pump by reversing the disassembly procedure, 

replacing old gasket s with new ones. BE SURE TO TAKE UP 
EVENLY ON ALL BOLTS SECURING BEARING HOUSING. Oth-
erwise, the housing may skew and misalignment may occur, 

Содержание CHEMPUMP BS

Страница 1: ...INSTRUCTION MANUAL for Installation Operation and Maintenance JUNE 2019 CHEMPUMPTM G SERIES Sealless Canned Motor Pump With Teikoku Rotary Guardian TRG...

Страница 2: ...ormation and recommendations Applicable Standards and Regulations The G Series pump conforms to the following standards 1 American Society of Mechanical Engineers ASME B 16 5 2 Canadian Standards Asso...

Страница 3: ...or liquid is present You must take measures if the possibility exists that the gas or liquid is toxic or hazardous to personnel or the environment Hazard Do not remove any bolts on pump motor or drain...

Страница 4: ...e 60 Hertz 13 Table 2 7 Oil Volume in Stators 14 Table 2 8 Standard Recirculation Flow Rates 14 Table 2 9 Circulating Tube Size 14 Table 4 1 Recommended Tools 21 Table 4 2 Bearing Journal Dimensions 2...

Страница 5: ...over 50 years G Series pumps feature automatic hydraulic thrust balance replaceable thrust surface design direction of rotation indication and precision front and rear bearings G Series are capable of...

Страница 6: ...he motor moves forward to lubricate the front bearing and then exits the motor section through the front bearing housing The fluid returns to the high pressure region of the impeller for joining the p...

Страница 7: ...rotor thus hermetically sealing off the rotor core from contact with the liquid being pumped 1 4 Bearings The bearings for the unit are metal sleeved or sleeveless and have a molded carbon graphite in...

Страница 8: ...st balance is generated by the pressure of the internally circulated pumped fluid flowing into a balance chamber just to the rear of the impeller When a change in load tends to change the position of...

Страница 9: ...ed in the Appendix of this manual Note Experience has proven that most pump troubles result from poor suction conditions including insufficient NPSH The suction line must have as few pressure drops as...

Страница 10: ...s to the same suc tion line provide gate valves so that any pump can be isolated from the line Install gate valves with stems horizontal to avoid air pockets Globe valves should be avoided particularl...

Страница 11: ...avy overloads This protection must be provided for by the current overload relay heaters in the magnetic starter The rating of the heaters should be high enough to avoid nuisance cut outs under runnin...

Страница 12: ...200 200 4 1 0 1 1 2 2 250 175 112 7 40K 3450 200 200 4 3 0 1 1 2 2 200 200 143 8 50K 3450 400 250 5 4 0 2 2 1 2 250 250 174 8 Table 2 3 G Series Electrical Data G Series Model Motor Size Start KVA Ful...

Страница 13: ...0K 3450 60 80 3 6 1 1 1 4 100 70 46 0 40K 3450 100 80 3 4 1 1 1 4 80 80 57 5 50K 3450 100 90 3 4 1 1 1 4 90 90 69 0 Table 2 5 Electrical Wiring Data for 460 Volt 3 Phase 60 Hz G Series Pumps G Series...

Страница 14: ...roduced in this manner should approximate the standard flow rates listed in Table 2 8 below Table 2 7 Oil Volume in G Series Stators G Series Model Motor Size Volume of Oil Fluid Ounces GA GA GB GC GB...

Страница 15: ...to the circulating tube port in the rear bearing housing 2 Run the tubing from the connection port fitting in the rear bearing housing back to the vapor space of the suction re ceiver preferably above...

Страница 16: ...abricated are also avail able for higher pressures 2 4 6 Heat Exchanger Similar to the water jacket in every respect except for the pro vision of corrosion resistant tubing heat exchangers whether rem...

Страница 17: ...Teikoku USA Chempump Instruction Manual G Series 17 Figure 2 8 Removable Water Jacket Figure 2 9 Removable Heat Exchanger...

Страница 18: ...ts a manual reset of the process controller is required B Dual pumps 20 Second Delay A Pump low differential pressure trip 60 Second Delay B Pump start 20 Second Delay B Pump low differential pressure...

Страница 19: ...oku TRC 1 hand held direction of rotation indicator is available from Teikoku USA This portable device can be used to confirm the rotation of any motor 1 Verify suction valve is 100 open 2 Set dischar...

Страница 20: ...period of two weeks or more the following inspections shall precede its operation a Check secureness of base hold down bolts if supplied b Check terminal box for moisture and tightness of fittings c U...

Страница 21: ...ring wear on the wear indicator 1 Measure the inside diameters of the front and rear bearings and compare to the diameter of the rotor shaft journal If the difference in diameters is greater than that...

Страница 22: ...re not within 20 of the values shown in Table 4 9 the stator as sembly must be replaced 4 2 5 General Inspection 1 Inspect the impeller nut threads on the rotor shaft to insure they are not cut presse...

Страница 23: ...ARNING PERSONNEL SAFETY HAZARD WILL EXIST IF THIS STEP IS NOT FOLLOWED 3 Drain pump 4 Begin disassembly carefully examining each part for corrosion or wear 5 Remove circulating tube back flush piping...

Страница 24: ...e housing 8 Remove the screw and lock washer holding the rear bearing to the rear bearing housing and then remove the rear bearing If the pump is equipped with a bearing wear detector please refer to...

Страница 25: ...Begin disassembly carefully examining each part for evidence of corrosion or wear 5 Remove water jacket or heat exchanger cooling inlet and drain connections if used 6 Remove circulation tube back fl...

Страница 26: ...amaged or inoperative for any reason will be re paired at the factory at minimum cost and returned to the cus tomer as quickly as possible Caution Before returning units to the factory for examination...

Страница 27: ...460 575 230 460 575 R R R R R R 1 73 6 92 10 80 1 02 4 08 6 38 0 04 0 26 0 26 0 03 0 12 0 19 GVD GVE GVHS GG 10K 10K 10K 15K 15K 15K 20K 20K 20K 230 460 575 230 460 575 230 460 575 R R R R R R R R R 0...

Страница 28: ...S T Model 34 Appx G Curve GVD T Model 35 Appx H Curve GVE T Model 36 Appx I Curve GVHS T Model 37 Appx J Curve N2S 10 15 20K 38 Appx K Curve N2S 30 40 50K 39 Appx L Sectional View GVBS 40 Appx M Secti...

Страница 29: ...akes the guesswork out of confirming the correct rotation of the motor It is light compact and easy to use Not only can this be used on Teikoku canned motors but other three phase induction motors as...

Страница 30: ...ller clogged Remove obstructions in impeller Wrong direction of rotation Reverse any two motor leads Damaged impeller Impeller must be repaired or replaced Pump loses prime after starting Pump not pro...

Страница 31: ...220 230 GVHS 400 420 220 230 GG 250 260 220 230 GKS 400 420 220 230 GK 400 420 220 230 GVM 220 230 220 230 GN GP GPS GRS CONSULT FACTORY Torque Values Torque should be applied to bolt sets in increasi...

Страница 32: ...full load kilowatt ratings for the referenced motor load lines When pumping fluids with specific gravities Curves are based on shop test while handling clean water at 20oC and at sea level Performance...

Страница 33: ...mbers beneath model designations indicate full load kilowatt ratings for the referenced motor load lines When pumping fluids with specific gravities Curves are based on shop test while handling clean...

Страница 34: ...eath model designations indicate full load kilowatt ratings for the referenced motor load lines When pumping fluids with specific gravities Curves are based on shop test while handling clean water at...

Страница 35: ...GVBS T NPSH wire to water Numbers beneath model designations indicate full load kilowatt ratings for the referenced motor load lines When pumping fluids with specific gravities Curves are based on sh...

Страница 36: ...ire to water Numbers beneath model designations indicate full load kilowatt ratings for the referenced motor load lines When pumping fluids with specific gravities Curves are based on shop test while...

Страница 37: ...99 108 HEAD ft 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 GPM 0 40 80 120 160 200 240 280 320 360 400 440 480 NPSHR mtr 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 HEAD mtr 0 6 1...

Страница 38: ...0 80 120 160 200 240 280 320 360 400 440 480 GPM 0 20 40 60 80 100 120 140 160 180 NPSHR m 0 0 1 5 3 0 4 5 6 0 7 5 9 0 10 5 12 0 13 5 15 0 16 5 18 0 NPSHR ft 0 5 10 15 20 25 30 35 40 45 50 55 60 HEAD...

Страница 39: ...m 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 HEAD m 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 NPSHR ft 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52...

Страница 40: ...0 80 100 120 140 160 180 200 220 NPSHR m 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 HEAD m 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 NPSHR ft 0 2 4 6 8 10 12 14 16 18 20 22 24 26...

Страница 41: ...Teikoku USA Chempump Instruction Manual G Series 41 Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC Appx M Sectional View GVBS...

Страница 42: ...Teikoku USA Chempump Instruction Manual G Series 42 Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC Appx N Sectional View GA GB GC...

Страница 43: ...Teikoku USA Chempump Instruction Manual G Series 43 Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC Appx O Sectional View GVD GVE GVHS...

Страница 44: ...Teikoku USA Chempump Instruction Manual G Series 44 Appx P Sectional View N2S...

Страница 45: ...Teikoku USA Chempump Instruction Manual G Series 45 A B C Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC 5 of 13 Appx Q Terminal Assembly Box...

Страница 46: ...ipment CHECK ONE OF THE FOLLOWING The pump has been flushed by following steps A through Both the complete pump and the stator assembly have A3 of the Teikoku USA Flushing Procedure on page 2 of been...

Страница 47: ...WOUND B1 REMOVE THE RELIEF VALVE INSERT A SCREWDRIVER INTO THE RELIEF VALVE ADAPTER AND PRY THE LISK FILTER TO ONE SIDE REMOVE THE CONNECTION BOX FROM THE LEAD NIPPLE AND CHIP AWAY THE POTTING COMPOUN...

Страница 48: ...COVER AND THE TERMINAL PLATE D2 WHEN PROCESS FLUID IS IN STATOR WINDING SUPPLY FLUSHING FLUID TO THE OPENING FOR SUFFICIENT TIME TO FULLY NEUTRALIZE THE PROCESS FLUID AFTER WASHING IS COMPLETED DRAIN...

Страница 49: ...F THE REFUSAL These requirements are essential to Teikoku USA s safety practices and reviews that serve to protect all of Teikoku USA s associates visitors and customers Teikoku USA thanks you in adva...

Страница 50: ...nsylvania 959 Mearns Road Warminster PA 18974 215 343 6000 Texas 5889 Bingle Road Houston TX 77092 713 983 9901 Ohio 27881 State Route 7 Marietta OH 45750 740 538 5332 www teikokupumps com HE 12270 12...

Отзывы: