background image

Maintenance (Continued)

4. Replace pressure switch tubing and

motor wiring.

5. Prime pump according to

instructions; see Operation.

6. Check for leaks.

TANK OPERATION CYCLE (MODEL
3P715B)

1. Tank nearly empty–air expands

filling area above vinyl separator
(Figure 24A).

2. Water begins to enter tank–air is

compressed above separator as it
fills with water (Figure 24B).

3. Pump-up cycle completed–air now

compressed to cut off setting of
pressure switch (Figure 24C).

4. Water being drawn from

tank–compressed tank air forces
water out of separator (Figure 24D).

5. Separator completely empty–new

cycle ready to begin (Figure 24A).

TESTING FOR BLADDER LEAKAGE

1.

Disconnect power to pump.

2. Drain all water from tank bladder

by opening faucet closest to tank.

3. Remove valve cap from valve and

release all pressure possible by
depressing valve core. When air
stops coming from valve, remove
valve core to release remaining
pressure.

4. Disconnect piping from elbow on

tank flange.

5. If bladder leaks, water will run out

of valve. If so, replace bladder. See
instructions below.

BLADDER REPLACEMENT

To be sure cover
flange cannot blow 

off of tank, release all air from system
before removing nuts from cover flange.

1.

Disconnect power to pump.

2. Follow steps 2 through 5 under

“Testing For Bladder  Leakage”,
above.

3. Remove nuts from tank cover

flange. Tap cover flange to break
seal and remove.

4. Bladder will not come out in one

piece. Hold bladder with pliers and
cut wherever convenient with single
edge razor blade or sharp knife.
Continue holding and cutting until
bladder is removed. 

5. Clean and dry inside of tank. 

6. Before bladder can be inserted into

tank, it must be tightly rolled up as
follows:

a. Place bladder on clean surface

with opening to one end and
flatten to force air out. Pull ends
out flat (See Figure 25).

b. To get tightest possible wrap,

start on one side at top and
TIGHTLY roll bladder diagonally
to other side (See Figure 26). To
force out as much air as possible,
roll toward bladder neck
opening. 

7. To help insert bladder, sprinkle 

outside of it with talcum powder. 
Push tightly rolled bladder into
tank, hooking bladder neck ring
over edge of tank head.

8. Insert arm in bladder and push

sidewalls outward. It is not
necessary to remove all wrinkles
from bladder.

9. Clean tank head sealing surface

and lid ring groove of flange.

Models 3P683D, 3P684D, 2P899A and 3P715B

13

Teel Operating Instructions and Parts Manual

®

E

N
G

L

I

S

H

A

Figure 24(A)

WATER

B

Figure 24(B)

WATER

C

Figure 24(C)

WATER

D

Figure 24(D)

848 0993

Figure 25 – Force all air out of bladder

849 0993

Figure 26 – Roll diagonally toward neck

Содержание 2P899A

Страница 1: ...a 6 gallon pre charged tank equal to a fifteen gallon standard tank Used with drilled cased driven point or dug wells or in cisterns or lakes Comes assembled to save on installation Equipped with a 11...

Страница 2: ...ound motor before connecting to power supply Meet United States National Electri cal Code Canadian Electrical Code and local codes for all wiring Follow wiring instructions in this manual when connect...

Страница 3: ...cept as provided below no warranty or affirmation of fact expressed or implied other than as stated in the LIMITED WARRANTY above is made or authorized by Dayton PRODUCT SUITABILITY Many jurisdictions...

Страница 4: ...ould be at least as large as the suction port on the pump include a check valve See Figure 1 Support the pipe so that there are no dips or sags in the pipe so it doesn t strain the pump body and so th...

Страница 5: ...est possible fittings especially elbows in the suction pipe The suction pipe should be at least as large as the suction port on the pump 2 Assemble a foot valve and suction pipe See Figure 3 Make sure...

Страница 6: ...ove the 1 8 NPT pipe plug from the pump Air Volume Control AVC port See Figure 5 Run tubing from the pump s AVC port See Figure 5 to the port on the AVC mounted on the tank See instructions provided w...

Страница 7: ...Manual E N G L I S H Figure 7 Motor wiring connections through Pressure Switch Match motor voltage to line voltage A B L2 L1 A B L2 L1 A B L2 L1 A B L2 L1 230 Volt to 115 Volt Conversion Spade Connect...

Страница 8: ...authority NOTE If you are connecting the motor to a 230 volt circuit using a four conductor cable connect both the neutral white and ground green to the ground terminal The other two wires two black w...

Страница 9: ...Run the pump through one or two complete cycles to verify correct operation This will also help clean the system of dirt and scale dislodged during installation Maintenance Pump and piping need not b...

Страница 10: ...haft flats and unscrew impeller by turning counterclockwise when looking into eye of impeller 5 To reinstall reverse steps 1 through 4 Mount diffuser as shown in Figure 20 6 See directions under Pump...

Страница 11: ...seat correctly after recleaning cavity place a cardboard washer over polished seal face and carefully press into place using a piece of standard 3 4 pipe as a press IMPORTANT Be sure you do not scrat...

Страница 12: ...8 washer pull heat sink into cavity See Figure 22 5 Clean out any surplus Permatex from insert cavity where new seal will be located Figure 23 6 Follow steps 2 through 11 under Installing New Seal PU...

Страница 13: ...nnect power to pump 2 Follow steps 2 through 5 under Testing For Bladder Leakage above 3 Remove nuts from tank cover flange Tap cover flange to break seal and remove 4 Bladder will not come out in one...

Страница 14: ...tire gauge Air pressure should be 2 psi below pump pressure switch cut in setting 3 If the air pressure is more than 2 psi below the cut in setting add air to the tank Use an air compressor or a porta...

Страница 15: ...ed Pipe plug 1 14 1 4 NPT w TFE Barbed elbow 2 15 Switch tube U37 191P 1 16 Plastic gasket J20 18 1 17 Pump ejector body insert N76 29P 1 18 10 16 Hi Lo Capscrew U30 742SS 4 19 45 Nozzle N34P 19 1 20...

Страница 16: ...list Address parts correspondence to Grainger Parts P O Box 3074 1657 Shermer Road Northbrook IL 60065 3074 U S A 1 Tank Assembly Incl Diaphragm Valve Nuts Inlet Flange U231 498 1 2 Inlet Flange Assem...

Страница 17: ...er level in a shallow well operation exceeds 25 ft a deep well pump is needed 3 Ejector or impeller is plugged 3 Clean ejector or impeller see maintenance 4 Check or foot valves stuck in closed 4 Repl...

Страница 18: ...f necessary add air pressure with an air hose Check air valve for leaks using a soapy solution and replace core if necessary Air spurts from 1 Pump is picking up prime 1 As soon as pump picks up prime...

Отзывы: