![Technische Alternative HZR 65 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/technische-alternative/hzr-65/hzr-65_operation-and-installation-instructions-manual_1069690021.webp)
21
Program 98:
Combined buffer tank instead of boiler and hot water tank. Thus output
A5
can
be used for burner requirement by
T1
.
A5 on = T1 < max
A5 off = T1 > max + diff2
Program 100:
as program 98, but switch-off threshold of burner requirement at
T3
(holding-
circuit).
A5 on = T1 < max
A5 off = T3 > max + diff2
Program 104:
as programs 98 resp. 100, but burner requirement refers to nominal flow
temperature and basic temperature (hot water).
A5 on = T1 < max or T3 < Vsoll + diff2 & (heating = active)
A5 off = T1 > max and T3 > Vsoll d fiff2 & (heating = active)
all pr1:
The heating function (heating = active) refers also to output
A2
.
A2 = T1 > min1 & T1 > T2 + diff1 & T2 < min2 & (heating = active)
Time programs
are possible for
A1
,
A2
and
A5
.
Содержание HZR 65
Страница 1: ...HZR 65 Version P5 6 7 EN Universal heating controller Operation Installation instructions en ...
Страница 2: ......
Страница 31: ...31 Schematic representation of setting values ...
Страница 57: ......
Страница 58: ......
Страница 59: ......