![Technische Alternative CAN-BC2 Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/technische-alternative/can-bc2/can-bc2_installation-and-programming-manual_1069711059.webp)
Data administration
59
Reset
The reset button is located behind a hole in the cover.
Pressing the reset button
briefly
will restart the bus converter (= reset).
Total reset
: Pressing the button down for a
long time
causes the status LED to start flashing
quickly
.
The button must be held down until the quick flashing changes to slow flashing.
A
total reset
deletes all function modules, the parameter settings for all bus inputs and outputs, fixed
values, system values and the CAN bus settings.
LED status indicators
Status indicators at converter start
Indicator
Explanation
Steady red light
The bus converter is booting up (= start routine after switching on, resetting or
updating)
or
Steady orange
light
Hardware initialising after booting up
Flashing green
light
After hardware initialisation, the bus converter waits about 30 seconds to
receive all the information necessary for function (sensor values, network
inputs)
Steady green light
Standard bus converter operation
Converter status
Reset button