Doc No: OMM50001243
Rev: C Page 19 of 68
This document and all the information contained herein are the confidential and exclusive property of TechnipFMC,
and may not be reproduced, disclosed, or made public in any manner prior to express written authorization by TechnipFMC.
Routine maintenance is an essential part of any successful pump operation. Properly
maintained FMC pumps are designed to offer years of trouble-free service.
Regular maintenance and inspection will keep your pump operating at peak
performance. FMC pumps have been carefully engineered to minimize maintenance
requirements and simplify these tasks when they are required. Regular inspections
allow operators to become familiar with normal pump operation so they can recognize
the signals of potential problems and schedule maintenance. The maintenance chart in
Table 4 shown below should be used as a guideline only. Many applications will require
adjustment of the intervals shown in this chart for severe or unusual operating
conditions.
Table 4: Maintenance Chart
Interval
Component
Service
Remarks
Break In
Crankcase Oil
Change
Drain and refill with new oil after first 50 hours of operation. Ensure
that the magnetic drain plugs are cleaned to remove debris.
Period
Inlet Strainer
Inspect
Clean if Required. The amount of material in the strainer will
determine the interval of cleaning.
Complete Pump
Inspect
General inspection of pump and system to check for proper operation
of equipment.
Daily
Packing sets
Inspect
Check the stuffing box area or cylinder liner area of the pump for
signs of leakage. Replace packing if leakage becomes excessive.
Pump System
Flush
Required for shutdown when pumping fluids that may harden or
corrode the pump if left inside once stopped.
Crankcase Oil
Inspect
Ensure that the oil is at proper level and has not been contaminated
by pumpage or condensation.
Weekly
Packing sets
Lubricate
If pump is supplied with grease zerks, apply grease to each fitting
every 100 hours or once per week.
Crankcase Oil
Change
Drain and refill with new oil. Clean magnetic drain plugs.
6 Months/
Stuffing Box Nuts
Inspect
Check the stuffing box nuts with a torque wrench to ensure they are
within specification.
4,000 hours
Connecting Rod
Bolts or Nuts
Inspect
Check the connecting rod bolts or nuts with a torque wrench to ensure
they are within specification. This should be done in conjunction with
oil change.