Doc No: OMM50001243
Rev: C Page 16 of 68
This document and all the information contained herein are the confidential and exclusive property of TechnipFMC,
and may not be reproduced, disclosed, or made public in any manner prior to express written authorization by TechnipFMC.
9. Make sure that all guards are in place and secure. Verify that all personnel are in
safe positions and that system conditions are acceptable for operation.
10. The pump is now ready to start.
NOTE
Whenever possible, use a bypass in the discharge line to allow the pump
to start in an unloaded condition (no discharge pressure). Slowly close
the bypass line to bring the pump into full load conditions. Shut down
immediately in if the flow becomes unsteady, pressure fluctuates, or if
unusual sounds or vibrations are noted.
11. Take temperature readings of the power end and stuffing boxes. Do not exceed
170° F (77° C) on power end. Do not exceed 160°F (71° C) on packing unless
packing is designed for hot fluid service.
Table 2: Recommended Drip Lubrication Rates
PLUNGER SIZE
(Inches)
Up to 1 1/2
1 1/2 to 2 1/2
DROPS PER MINUTE
8 to 10
12 to 14