Issue/Rev. 0.4 (6/17) ║ MN03010 • Page 24
Model 210 Valve (I / O / S) Manual
Service and Maintenance
Figure 37
– Tubing Installation
Re-wire solenoid connections. Ensure to reference proper preset controller or PLC
manuals for this process.
Once the valve is completely assembled, refer to the Start-up and Field Adjustments
section for proper valve tuning procedure.