www.technimount.com
BP25 and 25-HD UG 202111-01
19
Return To Table of Contents
Return To Table of Contents
INSTALLATION OF THE BRACKET ONTO THE LIFEPAK 15 MONITOR/DEFIBRILLATOR
(CONTINUED)
9.
The blocks have a left and right side.
10. Locate the screws provided with the bracket.
11.
There are two different types of screws.
▪
Two (2) Stainless Steel Flat Head
Philips Screws M4 x 0.7 x 30 mm
▪
Two (2) Stainless Steel Flat Head Philips
Screws M4 x 0.7 x 25 mm
12. Install the blocks into the ZOLL X Series Monitor/
Defibrillator using the two (2) Stainless Steel Flat
Head Philips Screws M4 x 0.7 x 30 mm.
Installation Guide
Left Side Block
Right Side Block
Содержание BRACKET PRO 25 Series
Страница 1: ...BRACKET PRO SERIE 25 25 HD USER GUIDE EMS TM ...
Страница 35: ...www technimount com BP25 and 25 HD UG 202111 01 35 Return To Table of Contents SAE Certification ...
Страница 36: ...Return To Table of Contents 36 BP25 and 25 HD UG 202111 01 www technimount com FAA Certification ...
Страница 37: ...www technimount com BP25 and 25 HD UG 202111 01 37 Return To Table of Contents ...