background image

Return To Table of Contents

12

BP25 and 25-HD UG 202111-01

www.technimount.com

Introduction

 SPECIFICATIONS

Product Name 

Bracket Pro Serie®

 

25-HD

Product Description

Single disc bracket mounting system to secure the ZOLL® X Series on surfaces 

and cots/stretchers in emergency vehicles.

Compatibility of Medical Device*

ZOLL X Series® Monitor/Defibrillator

Environment of Usage

EMS (Ground & Flight), Hospital/Clinic, Military

Product Section Material

• 

Main Assembly: Aluminum 6061-T6

• 

Standard Bottom Disc: Aluminum 6061-T6 with Stainless Steel Insert 

and Peek Cushions

Product Finish

• 

Main Assembly: Black-Anodized Finish

• 

Standard Bottom Disc: Silver-Anodized Finish

Environmental Regulations

Complying with RoHS 3

Temperature of Usage

- 35° C to 45° C

Certification 

Designed to Comply:

• 

SAE J3043

• 

FAA, 14 CFR 

§

 23 (applicable standards)

Installation

Device Retained on Main Assembly with 3 Blocks: 1 Lateral Block and 2 Side 

Blocks Installed onto the Medical Device

Attachment Options

Standard Bottom Disc

Transportation Compatibility System

Compatible with Technimount's:

•  Standard Surface Base

• 

Safety Arm System™ for Stryker Cots (PowerPro – XT and Mx-Pro) 

• 

Floor Mount Platform (Flight)

•  Wall Mount

Features

• 

Robust Mounting Solution for EMS/CCT/ALS Transport

• 

Access to all Connectors and Accessories 

• 

Flight and Ground Compatibility

• 

Multiple Configuration Options for Transport

Physical Overall Dimensions

Width 13.20 in, Depth 8.30 in, Height 1.60 in

Weight 

1.5 lb

Part Numbers 

•  100-12-XZ-HD - Bracket Pro Serie® 25-HD

•  100-20-UN - Standard Surface Base

Other Models and Configuration Options

Contact  Technimount  EMS  for  more  information  or  for  other  options  at 

[email protected]

* Product and medical equipment manufacturer names are trademarks

 or registered trademarks® of their respective holders. 

Technimount does not have a commerical relationship with these medical equipment manufacturers.

Содержание BRACKET PRO 25 Series

Страница 1: ...BRACKET PRO SERIE 25 25 HD USER GUIDE EMS TM ...

Страница 2: ...he written permission of Technimount or its affiliate companies Trademark Attributions Bracket Pro Serie Technimount EMS are registered trade marks of Technologies CGC Inc ZOLL X Series is a registered trademark of ZOLL Medical Corporation Technimount does not have a commerical relationship with Hamilton Medical Hamilton Medical does not promote or sell Technimount products In order to ensure cont...

Страница 3: ...s with your Technimount product its components or for any technical questions during the installation or maintenance please send an email to techsupport technimount com Please have the serial number of your Technimount product available as shown in the figure below when calling Technimount Customer Service or Technical Support Include the serial number in all written communications SERIAL NUMBER L...

Страница 4: ...al Operating Guidelines for the Safety Arm System 22 Operating the Bracket on the Safety Arm System 23 Installing the Bracket on the Standard Base 23 Rotating the bracket on the standard surface base 23 Removing the Bracket from the Standard Surface Base 24 PART NUMBERS 25 Kits and Other Options 25 MAINTENANCE GUIDE 26 Cleaning the Bracket System 26 Cleaning Process 26 Cleaning Solutions 26 Remova...

Страница 5: ...tents Return Policy 33 Prior to 30 Days 33 Prior 45 Days 33 Prior 60 Days 33 Return Authorization 33 Damaged Merchandise 34 Claim Process 34 Required Information 34 Findings and Conclusion 34 questions about our policy 34 SAE CERTIFICATION 35 FAA CERTIFICATION 36 ...

Страница 6: ...rovide a higher flexibility for different EMS protocols and applications The brackets includes a Standard Bottom Disc for installation on a surface or stretcher system When inserted into the Technimount Standard Surface Base they allows for 360 rotation of the medical device while securely locked The Red Quick Release Mechanism helps to deploy the unit almost instantly allowing EMS responders to e...

Страница 7: ...mount com BP25 and 25 HD UG 202111 01 7 Return To Table of Contents Introduction POSSIBLE MOUNTING OPTIONS FOR THE BRACKET PRO SERIE 25 AND 25 HD Standard Surface Base Safety Arm System Floor Mount Air Ambulance ...

Страница 8: ...d 25 HD UG 202111 01 www technimount com Introduction SYMBOLS AND DEFINITIONS SYMBOL DESCRIPTION Warning and Caution special attention is required Consult accompanying documents Safe working load symbol and Load balance symbol Pinch Point ...

Страница 9: ...h or serious injury It may also describe potential serious adverse reactions and safety hazards Caution Alerts the reader of a potentially hazardous situation which if not avoided may result in minor or moderate injury to the user or patient or damage to the equipment or other property This includes special care necessary for the safe and effective use of the device to avoid damage that may occur ...

Страница 10: ...the Standard Bottom Disc and medical device when placed on a surface High density aluminum plate with silver or black anodized finish High density aluminum side blocks to install onto the medical device High density aluminum lateral block for installation onto the medical device Standard Bottom Disc compatible with all of Technimount s mounting solutions Note Product may vary from images shown ...

Страница 11: ...Device Retained on Main Assembly with 3 Blocks 1 Lateral Block and 2 Side Blocks Installed onto the Medical Device Attachment Options Standard Bottom Disc Transportation Compatibility System Compatible with Technimount s Standard Surface Base Safety Arm System for Stryker Cots PowerPro XT and Mx Pro Xtension Pro Assistant LP Floor Mount Platform Flight Wall Mount Features Robust Mounting Solution ...

Страница 12: ...Retained on Main Assembly with 3 Blocks 1 Lateral Block and 2 Side Blocks Installed onto the Medical Device Attachment Options Standard Bottom Disc Transportation Compatibility System Compatible with Technimount s Standard Surface Base Safety Arm System for Stryker Cots PowerPro XT and Mx Pro Floor Mount Platform Flight Wall Mount Features Robust Mounting Solution for EMS CCT ALS Transport Access ...

Страница 13: ... contact Technimount Customer Service customerservice technimount com Technimount E M S Holding Inc C O Regulatory Affairs 3770 Jean Marchand Street Suite 100 C Quebec QC G2C 1Y6 Canada T 1 888 639 2758 F 1 855 339 6351 technimount com info technimount com WARNING End User Administrator is responsible to validate regulations and standards for safety in their region in order to comply with applicab...

Страница 14: ...erly the medical device could fall during transport and may cause injury to the patient or operator and or damage to the product 9 Do not allow untrained staff to assist in the operation of the mounting system Untrained technicians staff can cause injury to the patient or themselves 9 Do not place additional equipment or items onto the Bracket or mounts other than approved Technimount Systems or c...

Страница 15: ...bly causing premature corrosion of critical components 9 When ordering it is important to identify on which mounting system you need to mount the bracket on as their are different systems for different EMS applications e g EMS ground or air mounting systems 9 A maintenance program should be established for all Technimount equipment Preventive maintenance may need to be performed more frequently ba...

Страница 16: ...t System must work properly before being put into service 5 Refer to the identification of components at the beginning of this user guide if needed TOOLS REQUIRED FOR INSTALLATION Below are the basic tools required for installation If you have any questions regarding the installation or need assistance please contact our Technical Support team at techsupport technimount com 9 Philips Screwdriver N...

Страница 17: ... Series Monitor Defibrillator 2 Start by removing the 2 blocks located on the bottom of the ZOLL X Series Monitor Defibrillator 3 Remove both blocks with a Philips Screwdriver and store them as they will not be used for the installation of the Bracket Pro Serie 25 or Brack Pro Serie 25 HD Installation Guide INSTALLATION OF THE BRACKET ONTO ZOLL X SERIES MONITOR DEFIBRILLATOR ...

Страница 18: ...erie 25 HD 5 Locate both side blocks on the bracket These need to be removed and installed into the ZOLL X Series Monitor Defibrillator 6 Remove the side block by inserting the Philips Screwdriver from the bottom of the bracket 7 Remove both side blocks from the bracket 8 Keep the parts Stainless steel blocks and Socket Head Screws 10 32 x 3 4 in for the next step Installation Guide ...

Страница 19: ...ght side 10 Locate the screws provided with the bracket 11 There are two different types of screws Two 2 Stainless Steel Flat Head Philips Screws M4 x 0 7 x 30 mm Two 2 Stainless Steel Flat Head Philips Screws M4 x 0 7 x 25 mm 12 Install the blocks into the ZOLL X Series Monitor Defibrillator using the two 2 Stainless Steel Flat Head Philips Screws M4 x 0 7 x 30 mm Installation Guide Left Side Blo...

Страница 20: ...g to the left or right of the ZOLL X Series Monitor Defibrillator 14 Once the blocks are installed the ZOLL X Series Monitor Defibrillator can be installed onto the Bracket Pro Serie 25 or Bracket Pro Serie 25 HD 15 Place the ZOLL X Series Monitor Defibrillator onto the bracket 16 Locate the two 2 Stainless Steel Socket Head Screws 10 32 x 3 4 in that were removed from the bracket earlier ...

Страница 21: ... THE ZOLL X SERIES MONITOR DEFIBRILLATOR CONTINUED Installation Guide 17 Install the two 2 Stainless Steel Socket Head Screws into the bracket from under the disc 18 Tighten both screws 19 Install the two 2 Flat Head Philips Screws M4 x 0 7 x 25 mm 20 Tighten both screws 21 The ZOLL X Series Monitor Defibrillator is ready for EMS transport ...

Страница 22: ...ng with the cot stretcher 9 Stay with the patient and control the Safety Arm System and device during transport at all times GENERAL OPERATING GUIDELINES FOR THE SAFETY ARM SYSTEM Operation Guide CAUTION 9 Never let a patient grab manipulate or hold the Safety Arm System the Surface Base or bracket on the cot stretcher because it may cause injury to the operator or patient Secure the Safety Arm Sy...

Страница 23: ...o the Standard Surface Base slide into the base horizontally from the front of the base 3 Ensure the bracket is locked securely in the Standard Surface Base before manipulating the device or transporting the stretcher ROTATING THE BRACKET ON THE STANDARD SURFACE BASE 1 To rotate the medical device 360 turn the bracket inside the Standard Surface Base clockwise or counter clockwise to use the devic...

Страница 24: ... THE SAFETY ARM SYSTEM CONTINUED REMOVING THE BRACKET FROM THE STANDARD SURFACE BASE 1 To remove the bracket from the Safety Arm System press the Red Quick Release Mechanism located on the front of the Standard Surface Base 2 While holding the Red Quick Release Mechanism slide outwards horizontally to remove from the base ...

Страница 25: ...o Customer Service WARNING Do not modify any components of these system Modifying the products can cause unpredictable operation resulting in injury to the patient or operator NOTE Technimount reserves the right to change Part Numbers and Products without notice Please refer to Customer Service to ensure product part number availability For any replacement parts or for repair please contact Techni...

Страница 26: ...power washer can accelerate removal of contaminants collected during the use of the product 9 Rinse with clean water 9 Towel dry all components 9 Allow all other components to air dry 9 Avoid over saturation and ensure that the product does not stay wet longer than the cleaner manufacturer s guidelines for proper disinfecting WARNING 9 When cleaning always use appropriate personal protection equip...

Страница 27: ... to service WARNING 9 Failure to properly clean contaminated parts or components will increase the risk of exposure to blood borne pathogens and may cause injury to the patient or the operator PREVENTIVE MAINTENANCE A preventive and regular maintenance program should be established for all Technimount equipment Preventive maintenance may be required more frequently based on the usage level of the ...

Страница 28: ...unt com Check each routine and replace damaged or worn out parts if necessary Follow timetable below for maintenance either in months M or hours H in accordance with your Service s current maintenance practices and protocols ITEM ROUTINE 1 M OR 2 H 3 M OR 6 H 6 M OR 12 H 12 M OR 24 H Bracket 9 Inspect Bracket Inspect the screws Ensure it is working properly and there are no particles obstacles or ...

Страница 29: ...www technimount com BP25 and 25 HD UG 202111 01 29 Return To Table of Contents Maintenance Guide INSPECTION AND MAINTENANCE RECORD PREVENTIVE MAINTENANCE PERFORMED BY DATE TIME ...

Страница 30: ...Table of Contents 30 BP25 and 25 HD UG 202111 01 www technimount com Maintenance Guide TRAINING RECORD TRAINING DATE TRAINING METHOD USER GUIDE IN SERVICE IN CLASS ETC TRAINEE NAME BASIC TRAINING TRAINING UPDATE ...

Страница 31: ...ed are all currently available for purchase Some of the parts identified on the assembly drawing parts in this user guide may not be individually available for purchase Please call Technimount Customer Service 1 888 639 2758 or at customerservice technimount com for availability and pricing DESCRIPTION PART NUMBER Standard Bottom Disc 926 00 SS ...

Страница 32: ... replaced after the Warranty Period has expired the Warranty Period for the repair or replacement will expire three 3 months after the date of repair or replacement LIMITED RESPONSIBILITY AND WARRANTY The Limited Warranty does not apply to normal wear that should result from normal use It does not apply when the Hardware or any component is opened disassembled or repaired by someone not authorized...

Страница 33: ...IOR 45 DAYS Product must be unused undamaged and in its original packaging The product return request must be provided in writing and it must be approved by TECHNIMOUNT prior to returning the product Returns will not be approved on modified or damaged item Charges may apply if damaged or missing items Customer is responsible for a 25 restocking fee PRIOR 60 DAYS Product must be unused undamaged an...

Страница 34: ...in the RMA form online at https www technimount com service support service support overview REQUIRED INFORMATION Serial number Invoice number Identification of the issue Upload the pictures of the issue Submit the form A confirmation of the receipt of the claim will be sent to you within 2 business days If you have not received a confirmation email by then please contact techsupport technimount c...

Страница 35: ...www technimount com BP25 and 25 HD UG 202111 01 35 Return To Table of Contents SAE Certification ...

Страница 36: ...Return To Table of Contents 36 BP25 and 25 HD UG 202111 01 www technimount com FAA Certification ...

Страница 37: ...www technimount com BP25 and 25 HD UG 202111 01 37 Return To Table of Contents ...

Страница 38: ...ere it matters most Technimount E M S Holding Inc 3770 Jean Marchand Street Suite 100 C Quebec QC G2C 1Y6 Canada T 1 888 639 2758 F 1 855 339 6351 technimount com info technimount com 2021 Technimount E M S Holding Inc All Rights Reserved Printed in Canada ...

Отзывы: