Operation & Maintenance Manual
CD-135 / CD-155
OM-02-02
Chapter:
Issue:
Issue date:
Page:
Content:
02-OM-05-02
4
30.07.2014
6
8
Revision no.:
Revision date:
6
06.06.2016
5.3
Log of Revisions to Airworthiness Limitations
Issue /
Revision
No.
Description of Revision
1 / 1
Revision of the Inspection Time Intervals of the
Airworthiness Limitation Section
1 / 2
Implementation of rail pressure control valve
inspection (every 600 operating hours)
Increase of fuel feed pump 05-7310-K007301
inspection (every 600 operating hours)
Increase of coolant exchange (every 1200
operating hours)
Increase of v-ribbed belt replacement (every
1200 operation hours)
1 / 3
Revision of the reference to the chapter in the
Repair Manual for presetting of the proportional
pressure reducing valve (at every 100 operating
hours)
Implementation of high-pressure pump inspec-
tion (every 300 operating hours) in case of TS-1
jet fuel is being used (for clarification of the
situation, one Note and one Caution were
added as well)
1 / 4
Editorial changes
1 / 5
Increase of fuel feed pump 05-7310-K007301
inspection (every 1200 operating hours)
Implementation of friction disk replacement of
the new clutch design (every 300 operating
hours)
2 / 0
Editorial changes
2 / 1
Editorial changes
2 / 2
Editorial changes
Adaptation of clutch assy P/N
2 / 3
Implementation of FAA approval statement
2 / 4
Implementation of proportional pressure reduc-
ing valve 28V replacement (every 600 hrs)
Editorial changes
2 / 5
Increase of friction disk replacement
(every 600 hrs)
2 / 6
Implementation of a new fuel feed pump
05-7312-K0133xx
2 / 7
Implementation of a dual mass flywheel and its
inspection (every 600 hrs)
Содержание CD-135
Страница 2: ...This page intentionally left blank...