![Technibel Climatisation DKR8585C Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/technibel-climatisation/dkr8585c/dkr8585c_installation-instructions-manual_1067713016.webp)
* How to Test Run the Air Conditioner.
(1) Turn on the power source.
(2) Set the operation selector switch of the indoor
unit to the TEST position. This starts the fans,
producing uncooled forced air with the
OPERATION or OPR lamp lit. (Fig. 8-7)
(3) After 3 minutes, the system shifts into cooling
operation, and cool air will start to be felt.
Cooling operation with the switch at the TEST
position is unaffected by the room temperature.
(4) After stopping the test run, turn the operation
selector switch of the indoor unit to the OFF
position once , then move to ON position.
(5) Press the ON/OFF button on the remote control
unit to stop the air conditioner.
15
After finishing the test run,
do not leave the switch at the
TEST RUN position.
CAUTION
!