TECH ST-402N PWM Скачать руководство пользователя страница 15

Tech 

15

 -

 

V.a.14) 

 

Scheme 14/17 

 Reheating the CH Return 

Installation 14/17 Operates:

 

 

The Collector Pump.

 

 

The switching valve between the direct flow to the boiler 
and flow through the tank.

 

 

The  Accumulation  Tank  –  solar  with  top  and  bottom 

circulation.

 

 

The second tank (heated with an additional heat source 

e.g. the CH Boiler).

 

 

One direction of the collectors' location.

 

 

Pump of tank 2 – the Mixing Pump.

 

 

Installation Sensors:

 

 

The collector's sensor.

 

 

The two sensors of the Accumulation Tank.

 

 

Sensor of the second tank.

 

 

This installation is able to independently control from which tank it collects hot water for the 

facility  (the  regulator  selects  the  tank  with  the  higher  temperature).  In  periods  of  large  insulation, 
temperature in the Solar Tank may be high and it may be transferred to the second tank and thus may 
be used to heat more water than only that in the Solar Tank.

 

 

Note: Not possible to connect and select an additional device - the submenu Peripherals is hidden in 
the controller's service menu. The switching valve operating the additional receiver is connected instead 
of the peripherals.

 

 

Additional parameters to be adjusted:

 

 

Valve hysteresis.

 

 

Operation algorithm.

 

 

Deactivation delta of pump 2.

 

 

Activation delta of pump 2.

 

 

V.a.15) 

 

Scheme 15/17 

Installation 15/17 Operates:

 

 

The Collector Pump.

 

 

The Switching Valve.

 

 

The Accumulation Tank - Solar.

 

 

The second tank (heated with an additional heat source 
e.g. the CH Boiler).

 

 

One direction of the collectors' location.

 

 

Additional peripherals.

 

 

Installation Sensors:

 

 

The collector's sensor.

 

 

The two sensors of the Accumulation Tank.

 

 

Sensor of the second tank.

 

 

This installation is able to control which tank it collects hot 
water from for the facility – it allows the user to switch valve to water intake from whichever tank has 
the warmer water. In periods of poor insulation (i.e. the winter period), water is taken from the second 
tank (heated with an additional heat source, e.g. the CH Boiler). On the other hand, water from the 
solar tank heated by the solar installation reaches the input of the second tank as cold water

.

 

 
 
 

Содержание ST-402N PWM

Страница 1: ...Tech 1 User s manual ST 402N PWM...

Страница 2: ...ure the regulator is disconnected from the mains before perform ing any activities involving the power supply plugging cables installing the device etc The device should be installed by a qualified el...

Страница 3: ...l signal relay is necessary to control the heater III Principle Of operation Description of the Control Panel of a Sample System Opis panelu steruj cego przyk adowego uk adu The regulator is controlle...

Страница 4: ...Active Operation Mode The Symbol of Active Additional Device Peripherals Automatic Operation Mode Circulation Pump Collector Defrosting Mode Firing up the Pellet Boiler voltage free signal Holiday Mo...

Страница 5: ...VICE MENU Pumps Solar Pump Deactivation Delta in this case the pump will be activated again when the temperature on the collector increases above the tank s temperature by the Solar Pump Activation De...

Страница 6: ...of activating the disinfection the temperature of disinfection needs to be reached in no longer than the time defined by the user SERVICE MENU Peripherals Heater Anti Legionella Maximum Anti Legionel...

Страница 7: ...ction of property IV h Statistics The parameters in this submenu allow the user to monitor the current conditions of the controller s operation IV h 1 Gain This parameter allows the user to monitor th...

Страница 8: ...essing the Menu button In order to return to the display s main view exit the service menu the user should use the Exit button by pressing it several times or waiting for approx 30 seconds the device...

Страница 9: ...Time Anti Freeze Temperature Collector Delta Heat receiver Receiver Maximum Temperature Receiver Activation Temperature Heat Receiver Hysteresis Pumps Regulated Revolutions Collector Maximum Temperat...

Страница 10: ...al peripherals Installation Sensors The Collector s sensor The Accumulation Tank s sensor V a 2 Scheme 2 17 One Tank Order Installation 2 17 Operates The Collector Pump The Switching Valve top bottom...

Страница 11: ...not possible to cool down using the DHW pump Installation Sensors The collector s sensor The two sensors of the Accumulation Tank top and bottom The boiler temperature sensor Additional Parameters to...

Страница 12: ...k s pump Tank 1 with top and bottom circulation Tank 2 One direction of the collectors location Additional peripherals not possible to cool down using the DHW pump Installation Sensors The collector s...

Страница 13: ...irculation If the tank s temperature is too low the valve switches to the furnace Additional Parameters to be Adjusted additional submenu in the service menu Installation s Options reheating deactivat...

Страница 14: ...ta of pump 2 Activation delta of pump 2 V a 13 Scheme 13 17 Two Collectors Pump Valve Tank and Additional Tank Connected in Series Installation 13 17 Operates The Collector Pump The Switching Valve Th...

Страница 15: ...ce the submenu Peripherals is hidden in the controller s service menu The switching valve operating the additional receiver is connected instead of the peripherals Additional parameters to be adjusted...

Страница 16: ...eiver receiver maximum temperature receiver activation temperature heat receiver hysteresis V b Accumulation Tank This menu allows the user to adjust all parameters related to the tank heat container...

Страница 17: ...e of scheme 6 the setting relates to valve control when cooling the Collector down in the Summer Mode or Alarm Mode as well as when defrosting The valve hysteresis determines the difference in tempera...

Страница 18: ...minimum reheating temperature the pump is deactivated On the other hand when the temperature on the collector is below this limit and is increasing the pump is activated after reaching the minimum reh...

Страница 19: ...r declares the value of the collector s maximum alarm temperature when the pump may be damaged This temperature should be adjusted according to the collector s technical data Due to phenomenon of glyc...

Страница 20: ...hes to circulation 2 and the pump operates in operation cycles parameter Maximum Heating Time of Tank 2 as well as pause Parameter Oscillation Pause Time When the collector reaches a high enough tempe...

Страница 21: ...n NO deactivate Additional available devices and examples of connections supporting all available installation schemes are presented below In the case of using schemes 12 or 14 it is not possible to c...

Страница 22: ...rthermore a tank sensor is needed for it to operate in the case of two sensors in the tank the top sensor If the criteria referred to above are met the peripheral will be activated contact closing whe...

Страница 23: ...ve in the case of setting the installation scheme number 5 and 11 This parameter is used to adjust the threshold tank temperature at which the valve will switch to reheating the boiler s return V h 5...

Страница 24: ...free operation the regulator has been equipped with a range of safeguards 1 Installation Sensor Protection If one of the sensors is damaged an acoustic signal is activated and the following symbol wil...

Страница 25: ...its cables The user should also check if the controller is properly mounted and clean it if dusty or dirty Technical Data of ST 402N Controller Power Supply Voltage 230V 50Hz 10 Temperature Adjustment...

Страница 26: ...not replace the design of the CH installation It is aimed at demonstrating the possibility for expanding the controller The presented scheme of the heating installation does not contain cut off and pr...

Страница 27: ...t 7 IV h 3 Power Supply Failures 7 IV i Backlight 7 IV j Display Contrast 7 IV k Language 7 IV l Information 7 IV m Factory Settings 8 V Service Menu 8 V a Installation Scheme 10 V a 1 Scheme 1 17 Bas...

Страница 28: ...7 V b 10 Hysteresis of Tank 2 17 V b 11 Operation Algorithm 17 V b 12 Tank Reheating Priority 18 V c Solar Collector 18 V c 1 Overheat Temperature 18 V c 2 Minimum Reheating Temperature 18 V c 3 Anti...

Страница 29: ...Type of Agent 22 V g 3 Glycol Solution 22 V g 4 Calibration 22 V h Installation Options 23 V h 1 Reheating Activation Delta 23 V h 2 From Hour to Hour 23 V h 3 Energy Release 23 V h 4 Energy Release...

Страница 30: ...Voltage Directive LVD 2006 95 EC the Act dated April 13th 2007 on electromagnetic compatibility Journal of Laws 07 82 556 implementing the provisions of Directive EMC 2004 108 EC as well as the Regul...

Страница 31: ...y number assigned by the Main Inspector of Environmental Protection The symbol of a crossed out rubbish bin on a product means that the product must not be thrown out to ordinary waste bins By segrega...

Страница 32: ...ST 402N User s Manual v 1 0 3 32...

Отзывы: