Flushing technology
6-8
TECE flushing technology – cistern
Assembly
Shell construction stage
The corner valve of the TECE concealed cistern is closed
and pre-installed as a complete unit. The pressure can
be tested without the cistern needing to be opened. The
cistern only needs to be opened during the fine installa-
tion phase. During the shell construction stage, the cistern
remains sealed. An unbroken seal during fine installation
work guarantees that the cistern is clean and functional.
A damaged seal shows that the cistern has already been
opened.
Splash protection with seal
Fine installation
The TECE concealed cistern can only be opened by
destroying the seal on the splash protection. If the seal is
intact at the fine installation stage, the inner workings of
the cistern are intact and free of contamination.
The connection pipe must be well flushed out during com-
missioning of the concealed cistern. To do this, the hose
can be lead out of the cistern towards the outside. After
being flushed out, the reinforced hose can be screwed to
the filling valve without the need for any tools.
A special feature of the TECE concealed cistern is the
actuation block mounted on the splash protection. When
the concealed cistern is opened, it is completely removed.
This also works with the support frame for the actuation.
Splash protection with actuation block
Despite the small inspection opening there is ample space
to work within the cistern. The operating lever is shaped in
such a way that when inserted, it automatically hooks into
the drain valve's drawbar eyelets.