Flushing technology
6-25
4
Before mounting the flusher, make sure that the inlet flow
control is closed so that no water can leak out during
assembly. Close the shut-off using a flat-head screwdriver.
In the free-flow setting (fig. 3), the shut-off slot is parallel
with the housing, and in the closed setting (fig. 4), it is at
right angles to the housing.
5
30
Loosen and remove the flush pipe elbow.
6
Make sure that the connection piece is fitted with a seal.
This seal can be greased if necessary.
7
8
30
!
22
Insert the flusher and close it with the union nut.
9
Connect the transformer's plug-in connection.
10
Open the inlet flow control.
Содержание TECEplanus
Страница 1: ...TECE FLUSHING TECHNOLOGY Sanitary systems TECHNICAL GUIDELINES ...
Страница 2: ...Flushing technology 6 2 ...