background image

SAFETY

 

In addition to the standard safety guidelines listed at the 

beginning of this handbook, the following special safety 

items apply to the Telehawk. 

The machine shall be operated by one person 

only.

   

 

2

 

NEVER

  put  your  hands  inside  the  delivery 

chutes.    In  the  event  of  a  blockage  clear  it 

using  the  Blockage  Removal  Tool  provided, 

located  on  the  front  of  the  lower  housing.    First, 

disengage the hydraulic pump, lower the machine to 

the  ground,  apply  the  handbrake,  stop  the  engine, 

remove  the  key,  and  wait  for  the  rotor  to  come  to 

rest. 

3

 

NEVER

  enter  the  bale  chamber  unless  the 

machine has been lowered to the ground,  the 

engine  has  been  stopped  with  key  removed 

from  the  ignition,  and  the  machine  has  come 

to rest (see note 2 above). 

NEVER

  insert  anything  inside  the  chute  or 

bale chamber while the machine is running. 

 
5

 

DANGER. 

When  entering  or  leaving  the 

bale chamber take care, the floor surface may 

be slippery. 

6

 Beware  of  overhead  power  lines  when  the  

swivel  chute  deflector  is  fully  raised.  Contact  with 

power  lines  could  result  in  the  operator  receiving  a 

severe electric shock.   

 

7  Do not climb onto the top edges of the bale chamber 

whilst the machine is in use.  

8  Do not allow anyone to ride on the machine. 
9  Do not allow persons or animals to stand in front of 

the outlet chutes whilst the machine is running. 

10 Do not lower the machine if any person or animal is  

standing in the loading area in front of the machine, 

always ensure good forward visibility  when  lowering 

the machine.   

11 Never put your hand over a hydraulic leak.  Oil under 

pressure may enter the blood stream. 

12 The  spreading  of  dusty  or  mouldy  material  can 

create  dust  which may  have  adverse  health effects.  

Operator  exposure  to  such  conditions  should  be 

avoided  where  possible.    When  circumstances 

prevent  this,  either  use  a  loader  with  a  suitable 

forced  air  cab  filtration  system  or  an  adequate 

respirator.  Respirators must comply with the relevant 

Standard  and  be  approved  by  the  Safety 

Inspectorate.    Disposable  filtering  face  piece 

respirators  to  EN149  or  half  mask  respirators  to 

EN140  fitted  with  filters  to  EN  143  are  likely  to  be 

adequate. 

13

  Before  disconnecting  the  hydraulic  hoses  always 

lower  the  machine  onto  the  ground  for  safety 

reasons and to avoid residual pressure in the hoses. 

14  Care  must  be  taken  when  handling  large  bales,  as 

  they  have  sufficient  weight  and  density  to  cause 

  serious  injury.    Large  bales  should  be  handled  with 

  appropriate  machinery  either  directly  into  the 

  Telehawk  or  into  a  position  where  they  can  be  self 

  loaded.    Do  not  manually  load  bales  from  the  stack 

  above  the  machine,  so  as  to  prevent  the  risks  of 

  falling  into the machine and collapse of the stack of 

  bales.  

15 Caution after prolonged intensive use of the machine, 

the  oil  temperature  will  have  risen  causing  the  hoses 

and fittings to be hot.  

  

 

LEFT AND RIGHT HAND 

 

In  this  Handbook  and  Parts  List,  the  terms  Left  and 

Right Hand apply to the machine when viewed from the 

drivers seat of the loader. 

 

 

USE OF THE TELEHAWK

 

The machine is designed to spread only dry straw bales. 

The  machine  must  never  be  run  with  the  chute 

components removed.  Unapproved chute modifications 

should not be carried out as Safety Regulations may be 

infringed. 

 

USE ON THE PUBLIC HIGHWAY 

If the machine is attached to the front of the loader it is 

not  recommended  that  the  loader  is  driven  on  a  public 

highway. 

 

If the machine is to be transported along the public 

highway (any road where the public have access) 

behind the loader, it may be necessary to fit lights 

to  comply  with  local  road  traffic  legislation,  as  the 

machine is likely to obscure the loader rear light units. 
Suitable  lighting  kits  are  available  from  your  local 

supplier  or  may  be  obtained  by  contacting  Teagle 

Machinery. 
Failure to comply with road traffic legislation may lead to 

prosecution  by  local  law  enforcement  agencies  and 

could also result in a road traffic accident. 

 

LOADER SPECIFICATIONS 

Lifting capacity: Minimum of 2.6 tonnes.  

Oil  flow: 

Minimum  oil  flow  of  60  litres  per  min  (13.3 

gallons per min). Maximum oil flow of 120 litres per min 

(26.6 gallons per min). 

Oil pressure: 

Minimum of 160 bar (2320 psi). Maximum 

of 270 bar 3915psi  @ 80 

°

C (176 

°

F) 

Return line pressure: Maximum  20 bar (290psi). 
The hydraulic system requires a single acting valve with 

an unrestricted return. We recommend fitting an internal 

Ø3/4”  return  line  direct  to  tank.  Operating  the  machine 

without    a  free  flow  return  will  result  in  higher  than 

recommended back pressures causing failure of seals in 

both the valve and motors. 

Oil fittings:  

We recommend using flat face hydraulic oil 

fittings with a minimum 24.5mm orifice to allow enough 

oil  to  flow  freely.    Smaller  fittings  like  1/2”  agricultural 

fittings  will  work  but  can  restrict  flow  causing  back 

pressure resulting in heat generation. 

 

However,  the  suitability  of  any  particular  loader  will 

depend upon, 
a) the size and weight of the bale to be spread. 
b) the extent to which the boom is to be extended. 
 

 

FITTING  THE  JUNCTION  BOX  LEAD  ONTO  THE 

LOADER 

A 6 metre twin core cable with 7.5 amp blade type fuse 

is supplied with the machine. The end with two eyelets 

must be fitted to the battery of the loader with the cable 

routed in a suitable position without causing damage to 

the lead during operation. If the connector provided on 

Содержание Telehawk

Страница 1: ..._ _ _ _ _ _ _ _ _ _ _ _...

Страница 2: ...Grease Nipples x 2 At ends of SC Chute Ram Ref Description 3 Grease Nipples x 4 SC Swivel mechanism Ref Description 4 Grease Nipple Cross beater bearing 5 Grease Nipple Bed Chain front roller bearing...

Страница 3: ...nts of EEC Directive 2006 42 EC 2004 108 EC To effect correct application of the essential Health and Safety requirements stated in the EEC Directives the following harmonised standards were consulted...

Страница 4: ...Nevertheless in the interests of all concerned it is essential that equipment of our manufacture is used in accordance with the instructions that are supplied or are available from our Technical Staf...

Страница 5: ...rol box onto the loader 5 Preparation of the Telehawk 5 Fitting the Telehawk onto the loader 5 Operation 5 Commencing Operation 6 Maintenance 7 Disposal 9 FAULT FINDING CHART Part 1 10 Part 2 11 PARTS...

Страница 6: ...ale Size 1 2m x 1 2m x 2 5m Weight without brackets 1270kg Max Hydraulic Oil Pressure 210 bar Max Hydraulic Oil Flow 125 litres minute Min Hydraulic Oil Flow 65 litres minute Time Averaged Sound Power...

Страница 7: ...ty Teagle front housing DL1320 1 Do not permit riders DL1036 2 Teagle sides DL1389 2 Read instruction book DL1006 1 Telehawk DL1393 2 Blockage removal tool DL1070 1 Swish LH DL1383 1 Fingers being sev...

Страница 8: ...not manually load bales from the stack above the machine so as to prevent the risks of falling into the machine and collapse of the stack of bales 15 Caution after prolonged intensive use of the mach...

Страница 9: ...with excessive operation of the anti blocking system it may be advisable to adjust the bale restraint beam forwards away from the fan to reduce the material feed rate SWIVEL CHUTE The swivel chute rot...

Страница 10: ...chain the machine can be levelled out and the crossbeater and bed chain re started If spreading wet or poor quality bales it may be an advantage to stop both the cross beater and bed chain before incl...

Страница 11: ...ent them from turning and pinching hands and fingers between the bale restraint and the cross beater If blades have been fitted cover areas of the cross beater not being worked on with old carpet or h...

Страница 12: ...airs are required Copies of the circuit diagram are available from the manufacturer on request When the machine is not being used it is recommended that the control desk is stored safely away from the...

Страница 13: ...igure 7 BED CHAIN MOTOR The bed chain motor supports the front sprocket bed assembly The removal procedure is very similar to the crossbeater above Follow the same procedure but the motor mounting pla...

Страница 14: ...r contamination clean and replace Clear material and check bed chain tension 25 to 50 mm slack in centre of bed Bed chain has come off the sprockets Check sprocket condition replace the bed chain and...

Страница 15: ...pressure is applied to the valve via the supply hose and that the return line flow is not restricted Firstly remove the Bypass Relief Valve from the Flow Control Slice inspect for contamination clean...

Страница 16: ...ew M12 x 50 FAS9682P 1 Torque setting 90 N m 67 ft lb Spring washer M12 FAS2374P 1 4 Rotor SC6132 1 5 Fan motor holding plate SC6133 1 Setscrew M8 x 30 FAS2630P 4 Plain washer M8 FAS2343P 4 6 Pear sha...

Страница 17: ...19 Ribbed square insert SC4231 4 20 Junction box SC5824 1 Pan head screw M4 x 16 FAS2430S 4 Locknut M4 FAS2329S 4 21 3 Way flow control HYD5414 1 Setscrew M8 x 20 FAS2627P 2 large plain washer M8 FAS2...

Страница 18: ...S2631P 1 4 Chute ram CYL1035 1 Pivot bush ram body lower SC1297 1 Bolt M12 x 90 FAS9690P 1 Pivot bush ram body upper SC3297 1 Bolt M12 x 80 FAS9688P 1 Plain washer Form G M12 FAS2345GP 2 Locknut M12 F...

Страница 19: ...g infill SC6156 1 Cup square bolt M8 x 20 FAS9241S 2 Plain washer M8 FAS2343P 2 Locknut M8 FAS2332 2 15 Side inspection panel SC4329 1 Plain washer M8 FAS2343P 4 Locknut M8 FAS2332 4 16 Top housing SC...

Страница 20: ...rew M12 x 20 FAS2675P 2 Bolt M12 x 45 FAS9681P 2 Plain washer M12 FAS2345P 6 Locknut M12 FAS2334 4 Bale restraint complete Items 2 3 SC6116 1 2 Bale restraint beam SC6117 1 Setscrew M12 x 30 FAS2678P...

Страница 21: ...M HYD5240 1 Seal Kit Sauer Danfoss HYD5242 1 Crossbeater Assembly Items 7 8 SC6111 1 see Maintenenace section for removal 7 Crossbeater SC6112 1 8 Hook ripper short SC4219 52 Setscrew M8 x 20 FAS2627P...

Страница 22: ...SC4324 2 Plain nut M20 FAS2306P 4 M10 x 10 grub screw FAS8446 2 Plain washer M20 FAS2347P 4 8 Sprocket scraper rear SC4326 2 Setscrew M12 x 30 FAS2678P 4 Spring Washer 1 2 FAS2374P 4 9 Rear floor sect...

Страница 23: ...2334 4 Keyway 10x8x40 round end FAS8135 1 Seal Kit Brevini SAM Round HYD5241 1 Seal Kit Sauer Danfoss Round HYD5243 1 Seal Kit Brevini square motor HYD5245 1 INLINE OIL FILTER Ref Description Part No...

Страница 24: ...g Time lII On 5 Hold the sequence of buttons for 8 seconds until both the Bed Forward and ON LED s illuminate 6 Release buttons and the LED s should flash alternately 7 Using the Decreasing Un loading...

Страница 25: ...30S 4 M4 Locknut FAS2329S 4 6 Power cable 6m SC5826 1 Including fuse holder and eyelets Neutrik female socket only SC5837 1 7 7 5 A fuse SC3535 1 8 Telehawk boom bracket SC6142 1 9 Curly cable junctio...

Страница 26: ...1 E Crossbeater out to 3 way unit port P HYD2213 1 1 2 x 1 2 BSP M M union HYD1013 1 Bonded Seal 1 2 BSP HYD4204 1 1 2 x 3 4 BSP M M union HYD1119 1 Bonded Seal 3 4 BSP HYD4205 1 F 3 way unit port S1...

Страница 27: ...n MM HYD1011 1 Bonded Seal 1 4 BSP HYD4201 1 1 4 BSP M M union HYD1011 1 Ref Description Part No Q ty Associated components Part No Q ty 1 Pressure switch HYD5415 1 Pan head screw M5 x 80 FAS9516S 4 L...

Страница 28: ......

Отзывы: