EPP-2844-INT-9/16 3/20
Cable preparation
Overlap the cable ends as shown in the drawing.
Mark the reference line in the middle of the overlap.
Remove the cable oversheath according to the dimensions in
Table 1
.
Bend and position the cores as shown in drawing
A
. If required, cross the cores on the longer cable side.
Cut the cores at the reference line.
Cut back the core insulation on all cores to:
I = half connector length.
150
a
b
l
l
150
A
Reference line
Cable jacket
Insulation
Reference line
cut
remove
Table 1
Dimensions according to DIN 47640
Joint Type
Cross-
section
Cutback
dimensions
a
b
(mm
2
)
(mm)
(mm)
LJSU-4X01.5-016-NEWLEC
1.5 – 16
150
80
LJSU-4X010-050-NEWLEC
10 – 50
200
95
LJSU-4X035-150-NEWLEC
35 – 100
350
160
LJSU-4X095-300-NEWLEC
95 – 300
450
210
LJSU-5X01.5-016-NEWLEC
1.5 – 16
150
80
LJSM-4X010-050-NEWLEC
10 – 50
200
95
LJSM-4X035-150-NEWLEC
35 – 150
350
160
LJSM-4X095-240-NEWLEC
95 – 240
450
210
LJSM-5X004-016-NEWLEC
4 – 16
150
80
LJSM-5X010-050-NEWLEC
10 – 50
250
110
1
EN
b
a