TE Connectivity Confidential & Proprietary. Do not reproduce or distribute.
11
3. Attachment hardware Assy and back plate Assy procedure
3.5 Dust Cover Assembly to Socket
Once PnP covers are removed from the socket, carefully engage the dust cover vertically to the
bolster plate assembly posts over the socket.
Instruction Sheet
411-115008 Rev.A
20th Mar’20