59
Section VII
– Maintenance
1.0 Continued
C. Place the assembly back onto the cap and align
the holes in the new seal with the holes in the
cap.
D. Install the four screws evenly back in to the
assembly. Before tightening the screws, ensure
that the assembly is square to the cap (Figure
7.3).
E. Install the short rod through the push rod. Install
one snap ring on one side of the short rod.
F. Install the latch. Slide the large pin through the
back of the latch (Figure 7.4) with one snap ring
affixed to one end (Figure 7.5).
Figure 7.4. Install the Latch
Figure 7.5. Snap Ring
G. Install one washer between the flag and flag
assembly housing (Figure 7.6).
Figure 7.6. Attaching Flag Assembly to Housing
Assembly
H. Install the spring on to the push rod and then
install the second washer (Figure 7.6).
I. Install another snap ring to lock the large pin in
place. Refer to Figure 7.5.
Содержание PIG-SIG V
Страница 1: ...00 3795 0384 January 2018 Operating and Maintenance Instructions PIG SIG V Scraper Passage Indicator...
Страница 5: ...2018 All rights reserved T D Williamson Inc ii This page intentionally left blank...
Страница 7: ...2 Section I Safety This page intentionally left blank...
Страница 25: ...20 Section III Pipeline Not Under Pressure This page intentionally left blank...
Страница 71: ...66 Section VII Maintenance This page intentionally left blank...