28
Section IV
– Pipeline Under Pressure
2.0 Continued
2.2 Prepare Drilling Machine
A. Apply thread sealant to the adapter threads and
then thread the adapter on to the drilling
machine.
B. Extend the boring bar by rotating the feed tube
clockwise until the retainer spring can be
removed (Figure 4.4).
C. Remove the retainer spring.
D. Remove the cutting assembly (Figure 4.5).
E. Ensure that the drilling machine is set up with the
drilling machine adapter for PIG-SIG V
installation (no. 00-0706-0016-00).
F. Inspect the PIG-SIG V Plug holder (no. 00-8138-
0000-00) for damage. Ensure that the retainer
balls are firm and will not allow the PIG-SIG V to
fall off the plug holder.
G. Insert the plug holder into the end of the boring
bar (Figure 4.6).
H. Attach the retainer spring (Figure 4.7).
Figure 4.6. Insert Plug Holder
Figure 4.7.Attach Retainer Spring
Figure 4.4. Extend the Boring Bar
Figure 4.5. Remove the Cutting
Assembly
Содержание PIG-SIG V
Страница 1: ...00 3795 0384 January 2018 Operating and Maintenance Instructions PIG SIG V Scraper Passage Indicator...
Страница 5: ...2018 All rights reserved T D Williamson Inc ii This page intentionally left blank...
Страница 7: ...2 Section I Safety This page intentionally left blank...
Страница 25: ...20 Section III Pipeline Not Under Pressure This page intentionally left blank...
Страница 71: ...66 Section VII Maintenance This page intentionally left blank...