![TDW PIG-SIG V Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/tdw/pig-sig-v/pig-sig-v_operating-and-maintenance-instructions-manual_3901661031.webp)
26
Section IV
– Pipeline Under Pressure
1.0 Continued
C. Measure from the top of the valve to the top of
the PIG-SIG V nipple (Figure 4.2). Label this
Measurement “J” and retain for use when setting
the PIG-SIG V plug.
Figure 4.2.
Measurement
“J”
D. Prepare the T-101b drilling machine with a 1-
7/16-inch drill. Install and tap through the pipe
following instructions in the drilling machine
manual.
E. Close the tapping valve, bleed the pressure, and
remove the drilling machine.
⚠
WARNING
Vent pressure bleeder valve away from work area and
personnel. Stand clear of the vent when the bleeder
valve is opened. Otherwise, personal injury may result
from blowing material.
Содержание PIG-SIG V
Страница 1: ...00 3795 0384 January 2018 Operating and Maintenance Instructions PIG SIG V Scraper Passage Indicator...
Страница 5: ...2018 All rights reserved T D Williamson Inc ii This page intentionally left blank...
Страница 7: ...2 Section I Safety This page intentionally left blank...
Страница 25: ...20 Section III Pipeline Not Under Pressure This page intentionally left blank...
Страница 71: ...66 Section VII Maintenance This page intentionally left blank...